-
-
- What is the current status of the equipment?
- When did the issue start?
-
- Warranty and contract status
- Have you contacted the manufacturer or another service provider about this?
-
- How urgent is this?
- Are patient cases or stored specimens currently at risk?
-
-
- Is any lab furniture involved (chairs, desks, casework, filing cabinets)?
- Are any computers, monitors, cameras, printers, or IT equipment involved?
- Is any general medical equipment involved?
- Are any consumables to move or stock?
- What should happen to equipment being replaced or left behind?
-
-
-
-
-
Format: (000) 000-0000.
-
-
-
- Does the building require insurance certificates (moving, vehicle, or workers compensation)?
-
-
- Is floor surface protection required?
- Is wall protection required?
- Is elevator wall protection required?
- Are there authorized moving hours?
- Authorized hours — from
- Authorized hours — to
- Is badge, escort, or advance security clearance required for our crew?
-
-
- Is there an elevator?
- Is there a dedicated freight elevator?
-
-
-
-
- Are all doors along the path at least 36 inches wide?
-
- Are there any tight turns?
- Are there any stairs?
-
- Is there a loading dock?
- Are there loading dock hours?
- Dock hours — from
- Dock hours — to
- Is there space to park a moving truck?
-
-
-
- Is IVF Store disconnecting and removing alarm systems?
- Is IVF Store disconnecting and removing gas systems?
- Are there passthroughs to be removed from any hood or workstation?
- Is IVF Store packing smaller lab equipment, files, and documents?
- Are cryo tanks or liquid nitrogen dewars involved?
-
- Will frozen specimens (embryos, gametes, tissue) be transported as part of this project?
-
-
Format: (000) 000-0000.
-
- Are there any biohazard, chemical, or regulated waste handling requirements?
-
-
-
-
- Does the building require insurance certificates (moving, vehicle, or workers compensation)?
-
-
- Is floor surface protection required?
- Is wall protection required?
- Is elevator wall protection required?
- Are there authorized moving hours?
- Authorized hours — from
- Authorized hours — to
- Is badge, escort, or advance security clearance required for our crew?
-
-
- Is there an elevator?
- Is there a dedicated freight elevator?
-
-
-
-
- Are all doors along the path at least 36 inches wide?
-
- Are there any tight turns?
- Are there any stairs?
-
- Is there a loading dock?
- Are there loading dock hours?
- Dock hours — from
- Dock hours — to
- Is there space to park a moving truck?
-
-
-
- Is this new construction or a remodel?
- Projected construction completion date
- Do you have a layout or floor plan showing equipment placement?
-
-
-
- Which rooms are included in this project?
- Is RO or DI water available in the lab?
- Does any equipment require plumbed water or a drain (glassware washer, water-jacketed units)?
-
- How will aspiration and vacuum be supplied?
- Is IVF Store supplying or connecting VOC / carbon air filtration units?
-
- Bake-out completion date
- Has a bake-out or off-gassing period been scheduled before go-live?
- Is the lab HVAC, air handling, or VOC filtration complete and commissioned?
- Will other trades (electrical, plumbing, HVAC, casework) still be on site during our installation?
-
- Are there sufficient outlets in each area for each device?
- Are power strips needed?
-
- Are any dedicated circuits, special voltages, or unusual plug types required?
-
- Is there backup power or a UPS for critical equipment?
-
-
-
- What types of incubators will be in the lab?
- Is there a manifold system?
- Which gases will be used in the lab?
-
- How is gas supplied?
-
- Will gases be on site and connected on the day of installation?
- Expected date gases will be available
- Are the gas supply outlets inside the lab located near the equipment?
-
- Are regulators required?
-
- Will more than one gas supply be daisy chained to an incubator?
-
-
- Do you have a regulator for it?
-
-
- Do you want IVF Store to connect or install alarm systems?
-
- Is there an existing monitoring system to integrate with?
-
- Do you need remote or mobile alerting configured?
-
-
- Are there passthroughs to be attached to any hood?
- Do the hoods require gas input?
-
- Do you need computers, monitors, cameras, printers, or IT equipment assembled inside or on a hood?
-
- Is IVF Store setting up specialty IVF equipment such as time-lapse systems?
- Is gas and electrical available at those locations?
-
-