• Application Form for the CWCB Measurement Device Installation Program

    Divisions 4 & 5
  • PLEASE READ, IMPORTANT:

    • Please fill out a new form for each diversion measurement structure application.
    • Please review the FAQs and eligibility requirements on the Diversion Measurement Website before you begin.

    We recommend you gather the following materials beforehand to reduce the amount of time it will take you to fill out this form:

    1. Coordinates - Provide the latitude and longitude of your proposed measurement device (if you don't have the latitude and longitude, you can use the map tool in this application).
    2. Proof of Land Ownership - Confirm you own the land, otherwise you will need to provide written landowner acknowledgement, easement, or other documentation. 
    3. Diversion Measurement Structure Information -
      • Name of diversion measurement structure and what creek/river it diverts from
      • WDID (see instructions below on how to obtain this information) (optional)
      • Ditch dimensions (top width, bottom width, depth) (optional)
    4. Photos - Four (4) or more photos of your diversion measurement structure and its access road: 
      • Overview photo of the headgate or diversion.
      • Photo of the headgate or diversion looking downditch.
      • Photo of the measurement structure or proposed device location looking upditch towards the headgate or diversion.
      • Photo of an existing staff gauge and/or a side photo capturing the full width of the structure.
      • Photo(s) of access road if available.
    5. Information about when your diversion measurement structure typically diverts and when would be a good time of year to install a measurement structure. 

    There is an option at the bottom of this form to SAVE & CONTINUE LATER (expand the last dropdown - "Irrigation Schedule") if you need to leave the form to gather photos, information, etc. 

  • To continue, please review and acknowledge all items.*
    • Applicant Information  
    • Are you the applicant or are you filling out this form on behalf of the applicant? (required)*
    • If you are filling out this form on behalf of the applicant, please select an option that best describes your role: (required)*
    • Primary Contact Information

    • Format: (000) 000-0000.
    • Secondary Contact Information (or water user contact information if Primary Contact is not the water user)

    • Format: (000) 000-0000.
    • Physical & Mailing Address

    • Mailing address same as physical address? (required)*
    • Diversion Measurement Structure Location 
    • Image field 52
    • Enter the location of your proposed measurement device: Latitude and Longitude in decimal degrees.

      If you do not already have the location of your structure, use the interactive map below to identify the coordinates.

    • Drag the pin in the map below to select the location of your measurement device or diversion and determine the latitude and longitude.
    • Installation Access and Planning 
    • Are you replacing an existing measurement device or are you applying to install a new device on a previously unmeasured diversion? (required)*
    • Is there road access to the diversion measurement device? (required)*
    • Do you own the land where the diversion measurement device is located? (required)*
    • Is the diversion measurement device located on federal land? (required)*
    • Which federal entity owns the land on which your diversion measurement device is located?* (required)*
    • Browse Files
      Drag and drop files here
      Choose a file
      Cancelof
    • If your measurement device is located on FEDERAL LAND and you do not have an existing authorization, reach out to your respective federal entity to inquire about the authorization status of your structure. You must have prior authorization to be eligible for this program. 

      To inquire about status, send an email to your respective federal entity contact with the following information about your structure (at a minimum): “Hello, I am applying for the CWCB Measurement Device Installation Program. To be eligible for this program, I must receive prior authorization from your office for my structure. The structure in this application is the [DITCH NAME], located at Lat/Long of [##.####, -###.#####]. Can you please tell me what the status of my structure is? Thank you.”

    • Browse Files
      Drag and drop files here
      Choose a file
      Cancelof
    • Landowner Acknowledgement Forms

      Choose the form that is most applicable: 

      • Land owned by a single entity
      • Land owned by a corporation
    • Browse Files
      Drag and drop files here
      Choose a file
      Cancelof
    • Format: (000) 000-0000.
    • Diversion Measurement Structure Details  
    • Source: What stream or river does the your diversion measurement structure divert from? 

      Name: You must provide the name of the measurement structure. 

      WDID: Water District Identifier, WDID is a 7-digit unique identification number assigned by Division of Water Resources to each diversion measurement structure. If you have your WDID, please enter it. The WDID can be found on the CDSS Structures Tool: https://dwr.state.co.us/Tools/Structures, using the directions in the figure below.

    • Image field 164
    • What type of diversion measurement structure do you have? (required)*
    • Do you have a functioning headgate? (required)*
    • If diversion is a ditch or reservoir, do you have plans to move the headgate, install a new headgate, or realign the ditch? If so, the work needs to be completed by April 1st, 2027.*
    • Is water from the diversion measurement structure used primarily for agricultural purposes? (required)*
    • How often do you divert water?
    • Have you ever had to stop or reduce diverting water because the Water Commissioner or the Division of Water Resources required you to stop diverting (i.e., the ditch was curtailed)? (required)*
    • Please fill in the ditch dimensions to the best of your knowledge.
    • Photos

    • Please upload 4 or more photos of your diversion measurement structure which needs a measurement device. Please include:

      1. Overview photo of the headgate or diversion.
      2. Photo(s) of the headgate (or diversion) looking downditch.
      3. Photo(s) of the measurement structure or proposed device location looking upditch towards the headgate (or diversion).
      4. Photo(s) of an existing staff gauge and/or side photo capturing the full width of the structure or proposed location.
      5. Photo(s) of access road if available.

      Example photos are provided below. 

    • Browse Files
      Drag and drop files here
      Choose a file
      Cancelof
    • 1. Picture of the headgate (not a close up)
    • Browse Files
      Drag and drop files here
      Choose a file
      Cancelof
    • 1. Picture of the headgate (not a close up)
    • Browse Files
      Drag and drop files here
      Choose a file
      Cancelof
    • Image field 199
    • Browse Files
      Drag and drop files here
      Choose a file
      Cancelof
    • 1. Picture of the headgate (not a close up)
    • Browse Files
      Drag and drop files here
      Choose a file
      Cancelof
    • 1. Picture of the headgate (not a close up)
    • Browse Files
      Drag and drop files here
      Choose a file
      Cancelof
    • Irrigation Schedule 
    • Please indicate the month(s) when diversion is not active (ditch or pump is off) and when measurement structure installation would be best (consider access and weather): (required)*
    • The information provided in this form may be public information that is subject to disclosure, except to the extent otherwise provided by applicable law.

    • Should be Empty: