• Conduit Installation Safety Site Inspection

  • Site
  • Date/Time
     - -
    2 digit month, 2 digit day, 4 digit year
  • Job Safety Briefing performed for the crew?*
  • Job Hazard Analysis performed?*
  • Does the JHA Process Form match the work?*
  • Is the JHA Form complete and with hazards and mitigation?*
  • Cut-resistant gloves worn?*
  • Other PPE worn properly?*
  • PVC conduit cement/primer properly used?*
  • PVC conduit heat binding properly used?*
  • Pipe bending properly conducted? (No bracing against the roof membrane, no bouncing on lever, etc.)*
  • Pipe bending ergonomics correct?*
  • Pipe threading properly conducted? (In proper vise, tools, cutting fluid)*
  • Conduit cutting tools properly used? (band saw, wheel cutter, etc.)*
  • Conduit processing protects the roof membrane?*
  • Conduit properly secured?*
  • Expansions properly installed?*
  • Rollers properly installed?*
  • Couplers properly installed?*
  • Collars/penetrations properly installed?*
  • Grounding properly installed?*
  • Should be Empty: