• Panel Inverter Combiner Installation Safety Site Inspection

  • Site
  • Date/Time
     - -
    2 digit month, 2 digit day, 4 digit year
  • Job Safety Briefing performed for the crew?*
  • Job Hazard Analysis performed?*
  • Does the JHA Process Form match the work?*
  • Is the JHA Form complete and with hazards and mitigation?*
  • Cut-resistant gloves worn?*
  • Other PPE worn properly?*
  • Basement or vault properly installed (ground prep, stone, drainage, access, level, square, location, etc.)?*
  • Base support properly constructed, square, level, and fully supported (feet, slip sheets, mechanical attachments, piers, concrete, etc.)*
  • Panel mounting proper ergonomics (team lift, mechanical assistance, etc.)?*
  • Panel mounting proper handling (weight, size, support, etc.)?*
  • Panel mounting fasteners and method proper, sound, and complete?*
  • Panel knockout punch properly used? (strongly preferred method)*
  • Hole saw properly used? (least preferred method)*
  • Drill properly used (ergonomics, sharp bit, cutting management, etc.)?*
  • Collars/penetrations properly installed?*
  • Wire insulation protectors (bell ends, interior collars, etc.) properly installed?*
  • Grounding properly installed?*
  • Should be Empty: