• DESIGN SERVICES SELECTION & FEE SHEET

  • Interior Design • Fit-Out • Residential • Commercial
  • Date
     - -
    2 digit month, 2 digit day, 4 digit year
  • Client Selection Instructions

  • Please select the required design phases. Each phase may be commissioned independently, subject to the availability and approval of the information required from preceding phases. Final fees, programme, number of revisions and deliverables will be confirmed in the formal proposal.
  • PHASE 1 — PROJECT BRIEF & CONCEPT DESIGN

  • PHASE 1- PROJECT BRIEF & CONCEPT DESIGN
    Rows
  • PHASE 2 — 3D VISUALIZATION

  • PHASE 2- 3D VISUALIZATION
    Rows
  • PHASE 3 — DESIGN DEVELOPMENT

  • PHASE 3 - DESIGN DEVELOPMENT
    Rows
  • PHASE 4 — DETAILED / IFC DESIGN PACKAGE

  • PHASE 4 - DETAILED / IFC DESIGN PACKAGE
    Rows
  • PHASE 5 — BOQ & TENDER SERVICES

  • PHASE 5 - BOQ & TENDER SERVICES
    Rows
  • PHASE 6 — CONSTRUCTION STAGE DESIGN SERVICES

  • PHASE 6 — CONSTRUCTION STAGE DESIGN SERVICES
    Rows
  • PHASE 7 — PROCUREMENT, STYLING & HANDOVER

  • PHASE 7 - PROCUREMENT, STYLING & HANDOVER
    Rows
  • COMMERCIAL & SCOPE CLARIFICATIONS

  • COMMERCIAL & SCOPE CLARIFICATIONS
    Item Clarification
    Design Revisions Recommended allowance: two (2) revision rounds per design phase unless otherwise stated. Additional revisions are chargeable.
    Client Changes After Approval Changes requested after formal approval of a phase may be treated as additional services and may affect fees and programme.
    3D Renderings Number of spaces/views and rendering quality to be defined in the proposal. Animation and VR are excluded unless specifically included.
    MEP Engineering Design coordination does not automatically include full engineering calculations, authority submissions or specialist engineering unless expressly stated.
    Site Supervision Design supervision means periodic review of design intent. It is not full-time construction supervision, contractor management, HSE responsibility or quality- control responsibility.
    Project / Construction Management Project management and construction management are separate services and should be priced independently.
  • Authority Approvals Government/municipality/landlord approvals, permits and statutory fees are excluded unless specifically included.
    Procurement Purchasing, logistics, customs, storage, installation and supplier payments are excluded unless expressly included.
    BOQ / Cost Estimate Quantities and budgets may require verification by the contractor/quantity surveyor before contracting.
    Third-Party Consultants Structural, MEP, acoustic, fire/life-safety, kitchen, AV/IT, landscape and other specialist consultants are separate unless included.
    Travel & Site Visits Number and location of included site visits should be stated. Additional visits/travel may be chargeable.
    Copyright & Use Design documents are intended for the stated project and should not be reused or materially altered without the designer's written agreement, subject to the final contract.
  • FEE SUMMARY

  • FEE SUMMARY
    Rows
  • Client Confirmation

  • Selected services are subject to the final commercial proposal, agreed scope, exclusions, programme and terms of appointment.
  • Date
     - -
    2 digit month, 2 digit day, 4 digit year
  •  
  • Should be Empty: