• Subros Development Centers

    LEAD 4
  • Please enter you access code*
  • Participant Details

    Please Check your Details
  • The Test has started

    This test will auto-submit if the Submit button has not been pressed at the close of allocated time.
  • Section I

    Verbal Ability
  • Q1. The supervisor asked the team to ______ the readings before submitting the report because one value appeared unusually high.
  • Q2. Choose the option that BEST completes the relationship - Calibration: Accuracy :: Maintenance: ______
  • Q3. Read the passage and answer the question that follows: A plant shifted its daily production review from the end of the shift to the middle of the shift. Supervisors could then identify material shortages and staffing gaps several hours earlier. After six weeks, total output remained almost unchanged, but overtime reduced and fewer orders required last-minute rescheduling. Managers decided to continue the mid-shift review and monitor its longer-term impact. Which conclusion is BEST supported by the passage?
  • Q4. The manager's explanation was ______; it addressed the immediate issue but left the underlying cause unclear.
  • Q5. Choose the option that BEST completes the relationship:Blueprint : Construction :: Schedule : ______
  • Q6. Read the passage and answer the question that follows: A supplier offered a component at a price 6% below the existing source. After three months, however, the plant found greater variation in dimensions, leading to additional inspection and rework. Although the purchase price was lower, the total cost per usable component was slightly higher. The sourcing team therefore decided to review quality, logistics, and processing costs before renewing the contract. Which conclusion is BEST supported?
  • Q7. The data were ______ the team's initial assumption that defects were evenly distributed across all shifts.
  • Q8. Choose the option that BEST completes the relationship: Symptom : Diagnosis :: Variance : ______
  • Q9. Read the passage and answer the question that follows: A manufacturing unit introduced cross-training so technicians could work on more than one assembly line. During the first month, output fell slightly because employees spent time learning unfamiliar tasks. Four months later, absenteeism caused fewer production disruptions because trained employees could move between lines when needed. Management concluded that the early productivity loss had to be considered alongside the later improvement in flexibility.What is the BEST inference?
  • Q10. The proposal was not rejected; the decision was ______ until the team could provide evidence from a wider range of operating conditions.
  • Q11. Choose the option that BEST completes the relationship: Tolerance : Dimension :: Budget: ______
  • Q12. Read the passage and answer the question that follows: An engineering team proposed automating a manual inspection process after a successful trial. The trial, however, had been conducted on only one product variant and during a period of unusually stable production. Management did not reject the proposal but asked for evidence from additional variants and operating conditions before approving the investment. The team was asked to extend the trial before presenting its final recommendation. Why did management request a wider trial?
  • Q13. One month of improved performance may ______ the team's hypothesis, but it cannot by itself establish that the new process caused the improvement.
  • Q14. Choose the option that BEST completes the relationship: Prototype : Product :: Pilot : ______
  • Q15. Read the passage and answer the question that follows: A plant recorded a sharp fall in defects soon after introducing a new inspection checklist. At the same time, a major supplier changed its manufacturing process and the plant increased operator training. Because all three changes occurred within the same period, managers agreed that the improvement was encouraging but could not confidently attribute the lower defect rate to the checklist alone. Which statement BEST reflects the managers' reasoning?
  • Q16. The two reports are not necessarily contradictory; their findings may be ______ because one describes average performance while the other focuses on peak-hour variation.
  • Q17. Choose the option that BEST completes the relationship: Average : Variation :: Summary : ______
  • Q18. Read the passage and answer the question that follows: Two departments reported apparently different conclusions about machine performance. Maintenance found that average downtime had fallen during the quarter, while production reported more frequent short stoppages during peak hours. A joint review showed that both statements were correct: long breakdowns had reduced, but brief interruptions had increased. Management decided that the measures captured different aspects of performance and should be reviewed together. What is the BEST conclusion?
  • Q19. The evidence does not invalidate the proposal, but it does ______ the claim that the improvement can be attributed solely to the new process.
  • Q20. Choose the option that BEST completes the relationship:Standardisation : Consistency :: Redundancy : ______
  • Q21. Read the passage and answer the question that follows:A pilot production cell achieved 12% higher output than the existing line. The pilot, however, handled a narrower product mix, used experienced operators, and received priority maintenance support. Management viewed the result positively but questioned whether the same gain would continue after full-scale implementation. Before approving expansion, it requested a trial under conditions closer to those expected in normal plant operations.Which inference is MOST justified?
  • Section II

    Numerical Ability
  • Q22. Find the next number in the series: 7, 12, 19, 28, 39, ?
  • Use the following table to respond to Question 23

    Three production lines manufacture compressor units during a shift:

    Line  Plan Rejection Rate 
    Line P 1,000 units 2% 
    Line Q 1,500 units 4%
    Line R 2,000 units 3%
  • Q23. Refer to the table above. Assuming rejected units cannot be reworked, how many units are saleable in total?
  • Q24. Two shifts produce units in the ratio 5 : 4. Together they produce 540 units. Shift A has a rejection rate of 5% and Shift B has a rejection rate of 10%.How many good units are produced by the two shifts together?
  • Q25. Find the next number in the series:4, 10, 22, 46, 94, ?
  • Use the following table to respond to Question 26

    The monthly production plans and actual performance of three AC assembly lines are:

    Line  Plan Actual
    Line P 1,800 units 95% of plan
    Line Q 2,200 units 105% of plan
    Line R 2,500 units 92% of plan

     

  • Q26. Refer to the table above. What is the total actual production as a percentage of the total planned production, approximately?
  • Q27. A component is marked at 25% above its cost price. A customer is then given a 12% discount on the marked price. What is the profit percentage on the cost price?
  • Q28. Find the next number in the series: 2, 6, 15, 31, 56, ?
  • Use the following table to respond to Question 29

    Three compressor models have the following production and quality data:

    Model  Units Rejection Rejected Units successfully reworked
    Model P 2,400 4% 50%
    Model Q 3,200 5% 40%
    Model R 2,800 3% 25%
  • Q29. Refer to the table above. What percentage of total production is finally saleable, approximately?
  • Q30. Inspection Team A can complete a batch in 12 hours and Team B can complete the same batch in 18 hours. They work together for 4 hours, after which Team A is reassigned. How much total time, from the start, will Team B take to complete the batch?
  • Q31. Find the next term in the following series: A2, D6, H12, M20, ?
  • Use the following table to respond to Question 32

    Three assembly lines have the follwoing operating data for a shift:

    Line Capacity Scheduled Downtime Operating Efficiency
    Line P 90 units/hour 8 hours 1 hour 80%
    Line Q 100 units/hour 9 hours 1.5 hours 88%
    Line R 80 units/hour 10 hours 1 hour 95%
  • Q32. Refer to the table above. What is the total expected output from the three lines?
  • Q33. A 100-litre process mixture contains refrigerant and additive in the ratio 7 : 3. Twenty litres of the mixture is drained out and replaced with 20 litres of pure refrigerant. What is the new ratio of refrigerant to additive?
  • Q34. Find the next number in the series:4, 10, 24, 54, 116, ?
  • Use the following table to respond to Question 35

    An automotive AC plant has the following monthly data:

    Line Plan Actual  Rejection   Rejects reworked
    Line P 3750  96% of plan   5%   40% 
    Line Q 3000   105% of plan  4% 50% 
    Line R 3250   96% of plan   2.5% 50%
  • Q35. Refer to the table above. What is the plant's final saleable output as a percentage of total planned output?
  • Q36. A company supplies two batches of components whose total cost is ₹10 lakh. The first batch is sold at a 20% profit and the second at a 10% loss. Overall, the company earns an 8% profit on the combined cost.What was the cost of the first batch?
  • Q37. Find the next number in the series:3, 7, 16, 35, 74, ?
  • Use the following table to respond to Question 38. For one production day, three lines have the following data:

    Line Rated Scheduled Downtime  Performance during running time 
    Line P 80 units/hour   10 hours 10%  90% 
    Line Q 100 units/hour  8 hours 12.5%  95%
    Line R 60 units/hour  10 hours 5% 90% 
  • Q38. Refer to the table above. What is the combined actual output?
  • Q39. Twelve technicians can inspect 900 units in 15 days at their normal productivity. After working for 5 days, 3 technicians are reassigned. At the same time, a revised method improves the productivity of each remaining technician by 20%. Approximately how many additional days are required to finish the remaining work?
  • Q40. Find the next term in the following series: A2, C6, F12, J20, O30?
  • Use the following table to respond to Question 41. Units rejected at Stage 1 are scrapped. A stated percentage of Stage 2 rejects can be successfully reworked.

    Line Input  Stage 1 Yield  Stage 2 Yield   % of Stage 2 rejects reworked
    Model P 2,000 95% 96% 50%
    Model Q 2,500 92% 95% 40%
    Model R 2,500 96% 95% 25%
  • Q41. What is the overall final saleable yield as a percentage of total input, approximately?
  • Q42. A job is planned to be completed by 18 technicians in 20 days, working 8 hours per day at normal productivity. After the first 5 days, 3 technicians are reassigned. For the next 5 days, the remaining technicians work 10 hours per day and their hourly productivity is 20% higher than normal. After that, they return to 8-hour days and normal productivity. How long will the job take in total?
  • Section III

    Critical Thinking
  • Q43. A customer asks for a 10% increase in monthly supply for the next two months. The plant has enough spare capacity and the additional volume can be produced without overtime or new investment. The selling price and payment terms remain unchanged.What should the manager do FIRST?
  • Q44. A new engineer notices that an experienced operator is reluctant to follow a revised work instruction. The operator says the old method is faster and has worked for years. What is the MOST appropriate response?
  • Q45. A line has missed its hourly production target twice during a shift. Machine availability is normal, but operators report that components reached the workstation late on both occasions.What should the line supervisor do FIRST?
  • Q46. A supplier offers a component at 5% lower price than the current source. The new supplier meets the technical specification but requires a larger minimum order quantity, increasing inventory by about three weeks. Which factor should receive the MOST attention before switching suppliers?
  • Q47. Two engineers from Production and Quality disagree repeatedly about whether a recurring defect should stop the line. Their arguments are beginning to delay decisions and affect the rest of the team.What should their manager do?
  • Q48. A machine has three brief stoppages during the morning shift. Each restart is quick, and the daily target is still achievable. The same type of stoppage occurred twice the previous day. What is the BEST action?
  • Q49. A major customer asks the plant to increase supply by 15% for three months. The volume can be met only through overtime and by postponing preventive maintenance on one line. The customer indicates that future business allocation may depend on responsiveness. What should the plant manager do FIRST?
  • Q50. A technically strong engineer has recently become team leader. Two experienced team members repeatedly challenge his decisions in meetings. He has started avoiding discussion with them and gives instructions separately to others. What would be the MOST effective action?
  • Q51. A production line has missed its daily target for four consecutive days. Machine availability and manpower are unchanged, but cycle time has increased by about 8%. Operators report material delays, while maintenance records show several short stoppages.What should the line manager do FIRST?
  • Q52. A customer wants a price reduction of 4% in return for a two-year volume commitment. The plant expects process improvements to lower conversion cost by 3%, but the saving has not yet been demonstrated. Rejecting the proposal may open the account to a competitor. What is the BEST response?
  • Q53. A cross-functional improvement project is behind schedule. Production says Engineering changes too many specifications; Engineering says Production does not provide reliable trial data. Meetings have become defensive, but both teams have information needed to solve the issue. What should the project leader do FIRST?
  • Q54. A line's rejection rate rises from 2% to 4% after a tooling change. Inspection shows defects concentrated on one dimension, but the measurement system itself has not been checked recently. Production wants to reverse the tooling change immediately. What should the manager do FIRST?
  • Q55. A new vehicle program offers attractive annual volume, but requires a dedicated fixture costing ₹1.2 crore. The customer's forecast is strong for the first two years but uncertain thereafter. The fixture has limited use for other products. Which approach provides the BEST basis for the investment decision?
  • Q56. A high-performing engineer routinely solves urgent problems personally. His team appreciates his technical ability but increasingly waits for him before acting, and two capable team members have stopped proposing solutions because he often replaces their ideas with his own. What would MOST strengthen the team's performance?
  • Q57. A line shows good average output for the week, but hourly data reveal repeated periods of overproduction followed by waiting. Finished inventory between two processes is increasing, yet the final dispatch volume has not improved. What is the MOST appropriate interpretation?
  • Q58. A customer proposes shifting part of its business to the plant if the company develops a customized component. The projected margin is attractive, but the design will use scarce engineering capacity also needed for an existing platform launch carrying contractual penalties for delay. What should management do?
  • Q59. A manager needs support from Procurement for a cost-reduction project, but Procurement's current priority is supplier localization. The manager has no authority over the Procurement team. Both initiatives use the same limited supplier-development resources. What is the BEST approach?
  • Q60. A recurring defect disappears after both a machine setting and a supplier batch are changed on the same day. The team wants to close the problem because rejection has returned to normal. No controlled test has been performed. What should the manager do?
  • Q61. A strategic customer offers a five-year contract with guaranteed base volume but requires a significant price reduction from year three. The business case is attractive only if planned automation delivers the expected productivity gain. The automation is technically feasible but has not yet been implemented at this scale. Which decision approach is MOST robust?
  • Q62. A plant-wide cost program requires Operations, Quality and Engineering to change long-established practices. Each function supports the overall target but believes most changes should come from the other two. Previous meetings ended with broad agreement but little action. What should the program leader do NEXT?
  • Q63. A plant is considering raising a line's speed by 8% to recover a persistent delivery backlog. Trials show higher output, but also a small rise in temperature variation and two downstream stations operating close to capacity. Customer specifications are still being met during the trial. What should the operations manager do BEFORE making the higher speed permanent?
  • Should be Empty: