Qualification and certification. Qualification is not full standards certification. Full certification is an optional, separately priced test using a suitable calibrated certifier against the agreed Cat6 permanent-link or channel test limit, with a pass/fail PDF report for each tested link. The quote identifies the test standard, link model and any manufacturer-specific requirements. Test reports alone do not promise manufacturer warranty eligibility.
Separate scope and access costs. Unless expressly included in the written quote, labor-only drop pricing excludes materials, new pathway/support systems, conduit, coring, firestopping, lifts or scaffolding, permits, wall/ceiling repair, painting, hazardous-material work, extraordinary access and after-hours work. These items are priced separately before work. Necessary compliant firestopping is never omitted; it must be included in the agreed scope or provided by an identified qualified party before completion.
Customer-supplied materials. Customer must supply sufficient compatible, undamaged, appropriately listed materials suitable for the environment and specified Cat6 performance, including plenum-rated cable where required. Copper-clad-aluminum cable, mismatched or unsuitable connectors, and materials unable to meet the agreed test limit are not accepted as compliant substitutes. Customer provides product specifications and any required warranty-system documentation before scheduling. Mynians may pause or decline installation of unsuitable materials.
Extra work and repeat visits. Extra time caused by defective, incompatible, missing or unsuitable customer materials is outside base per-drop labor. After documenting the cause and obtaining written approval, diagnosis, replacement installation and retermination are billed at $129.99 per technician per hour, with a one-hour minimum and half-hour increments thereafter, plus approved replacement materials and agreed remobilization. Separately requested repeat certification is quoted before work; the normal certification minimum applies to a new test session, not to each cable retest.
Our workmanship. Mynians will correct its own installation workmanship and retest the corrected work without charging Customer additional labor or testing fees. A failed test by itself does not establish that customer materials caused the failure. Customer-supplied product defects and third-party work are not covered by that workmanship correction.
Written approval before extra charges. The accepted project quote records drop counts by environment, route assumptions, material responsibility, qualification or certification choice, mobilization, access/equipment costs and the total approved price. Hidden conditions, added drops, changed routes, extra visits and work outside that scope require a written change order before additional charges are incurred. Certification equipment or rental needs must be included in the accepted quote; no unapproved equipment charge is added later.