Teamforce Infrastructure Division are recruiting experienced plant operators for major energy transmission works in the Highlands of Scotland.
This is one of the largest energy infrastructure programmes in the UK — new 400kV substation and overhead line works running from Caithness down through Sutherland, with the programme continuing to 2030. Long-term work for the right operators, not a few weeks and home.
WHAT WE NEED
✅ 360 Operators — CPCS or NPORS, above and below 10 tonne
✅ Machine Operators — dozer, ADT, dumper, roller, telehandler
✅ Tractor Drivers — tractor and trailer/bowser work on access tracks
✅ Valid CSCS, CPCS or NPORS card
✅ Previous experience on civils, earthworks or utilities sites
WHAT YOU GET
💰 Excellent rates, DOE
🏠 Lodge allowance paid on top of your rate
📅 Long-term work with genuine continuity
⚡ Experience on a landmark UK energy scheme
You arrange accommodation — the lodge allowance is paid in addition to your hourly rate.