• Americans with Disabilities Act Municipal Self-Analysis and Transition Plan for Pedestrian Infrastructure Application

    Please contact cward@capitalmpo.org with any questions.
  • Format: (000) 000-0000.
  • Browse Files
    Cancelof
  • The Transportation Council has a public map showing existing sidewalks and paved multi-use trails data in the maps section of our website.

  • 0/350
  • Browse Files
    Cancelof
  • Public outreach is required for ADA Transition Plans. As part of this project, you will be required to advise the public of this project and its process, and to solicit public input into the plan and its priorities. Please list here the groups and/or individuals that you will include as part of this effort. The list should include representation of people who have a disability.*
    Rows
  • Budget

    A minimum 10% cash match will be required. For estimation purposes, assume a total project cost of $700 per mile of sidewalks and multi-use trails. Ensure the total match you list below is at least equal to 10% of the total project cost.
  • Enter the staff positions that will contribute in-kind time, the total hours for each position, and the type of work or contribution they will provide.
    Rows
  • 0/200
  • Browse Files
    Cancelof
  • Provide the participant list for the project advisory group, including staff and/or members of the public, particularly people who may have a disability. This advisory group will meet for a Kickoff meeting and up to two additional times over the course of the project, as determined by you, the Transportation Council, and/or the project consultant.*
    Rows
  • Do you have the ability to collect infrastructure locations?

  • Do you have in-house GIS capabilities? If yes, please provide the primary GIS contact's name.
  • Upload a File
    Cancelof
  • Should be Empty: