Slabs Process Checks
Inspected by
*
Please Select
Alex Andrejczuk
Andrew Parker
Bray McGhie
Eliott Nunn
Erwin Buchanan
Jack Hough
Jon Harrison
Patryk Dunaj
Stuart Parker
Solidcor Door Number
*
Door Type
*
Please Select
R30
T30 FED
T30 COM
R60
T60
Back
Next
Checks
Is the slab the correct style for the works order?
*
Yes
No
Slab style – issue details
*
Slab style – photo of issue
*
Is the slab correctly handed?
*
Yes
No
Handing – issue details
*
Handing – photo of issue
*
Are all the features required on the works order present (eye viewer, letter plate, Auro etc.)?
*
Yes
No
Features – issue details
*
Features – photo of issue
*
Are the hinge pockets all to the correct depth (checked with hinge and intumescent)?
*
Yes
No
Hinge pocket depth – issue details
*
Hinge pocket depth – photo of issue
*
Are the hinge pockets located correctly within +/- 1 mm?
*
Yes
No
Hinge pocket location – issue details
*
Hinge pocket location – photo of issue
*
Are both sides of the door free from skin damage?
*
Yes
No
Skin damage – issue details
*
Skin damage – photo of issue
*
Are all four edges free from edge band damage?
*
Yes
No
Edge band damage – issue details
*
Edge band damage – photo of issue
*
Is the edge band the correct colour?
*
Yes
No
Edge band colour – issue details
*
Edge band colour – photo of issue
*
Front of Slab Photo
*
Back of Slab Photo
*
Back
Next
Final Check
By marking this slab complete you are agreeing that this slab (door leaf) is compliant and within tolerances. You also acknowledge that it is in good condition and finished well. This slab check is completed before the slab moves on to doorset assembly, and the slab will be checked again as part of the doorset Final Check.
I am happy this slab (door leaf) complies with our QC checks and is ready to progress to doorset assembly.
*
Yes
No
Comments:
Signature
*
Date
*
/
Day
/
Month
Year
2 digit day, 2 digit month, 4 digit year
Date
Hour Minutes
Submit check
Should be Empty: