• Scope and functionality

  •  

    Please note: Once you start adding information into this document, you can come back at any time to make any changes by signing up by email, or sending a link of the form to yourself [please click on ‘SAVE YOUR PROGRESS' at the bottom of this page].

    Please do not press ‘Submit’ until you are ready to send us your feedback. Once you submit the form, you will not be able to go back and make any amends.

     

  • Scope and Assessment boundaries

    We propose defining a set of main asset types for data centres, each with its own sub-types, across BREEAM's data centre offer. This will enable future benchmarking and improved comparability of assets on a portfolio level, as well as performance benchmarking of assets across geographic areas.

  • 1) What should be the main asset types for data centres?
  • 1.1) Based on the previous answer, please indicate any asset types or sub-types that should be added, removed or amended, and provide supporting reasons where relevant.

    Enterprise

    Corporate Enterprise
    Government / Public Sector
    Research & Education
    Other (please specify)

    Colocation

    Retail
    Wholesale
    Managed Service Provider
    Other (please specify)

    Hyperscale

    AI
    Cloud / Big Data
    Other (please specify)

    Telecom / Network Operator

    Telecom / Network Operator
    Other (please specify)

  • We are also reviewing the assessment boundaries, and propose dividing the functions within the data centre into principal functions and supporting functions. This distinction aims to better reflect the primary purpose of data centre facilities while ensuring that the supporting infrastructure and ancillary spaces are accurately considered within the BREEAM assessment.

  • 2) Review Figure 1 in the BREEAM New Construction V7 Data Centres Annex. How well do you agree with the division between principal and supporting functions for BREEAM assessment? What would you adjust, if anything?
  • We are seeking feedback on whether these project types should be recognised within BREEAM and, if so, how assessment requirements should differ from those applied to conventional industrial buildings.

  • BREEAM Refurbishment and Fit Out V7 differentiates between refurbishment (RF) and Fit Out (FT) projects. We are seeking feedback on whether the data centre sector would benefit from equivalent assessment routes and how these project types should be accommodated within the data centre offer.

  • In colocation facilities, sustainability outcomes, operational control and access to evidence may be shared between facility operators and tenants. We are seeking feedback on how responsibilities should be allocated within BREEAM assessments to ensure requirements are both practical and reflective of industry practice.

  • Scheme Format

    This section applies to both New Construction and Refurbishment and Fit Out lifecycle stages.

    BREEAM currently assesses data centres through bespoke annexes to its core building schemes. We are considering whether BREEAM for Data Centres should instead be delivered as a dedicated asset type within the core BREEAM V7 schemes, or continue as a standalone annex. This aligns with BREEAM's strategic ambition to provide a whole-life-cycle certification offering and a simpler, more consistent experience for clients, assessors and other stakeholders.

    We are also considering whether data centre-specific requirements should be integrated within the relevant BREEAM V7 Commercial technical manuals or maintained in a separate data centre-specific document.

  • Operational performance data for data centres is not widely disclosed. BREEAM is considering what role certification should play in improving transparency. Operational performance data can support benchmarking, improve understanding of actual asset performance and help identify opportunities for continuous improvement across the sector. We want to understand what currently limits disclosure, whether sharing performance data should be a requirement of certification, and at what level any disclosure should apply. The levels we are considering are disclosure to BREEAM as assessment evidence, inclusion in anonymised sector benchmarks, and public disclosure. We also want to understand which metrics owners and operators would be willing to share, and which should not be shared.

  • 6.2) If a disclosure requirement were introduced, at what level should it apply:
  • Data centres share many characteristics with other commercial building asset types and therefore may be able to utilise a significant proportion of the standard BREEAM V7 New Construction and Refurbishment criteria. However, certain aspects of data centre design and construction may require data centre-specific solutions.

    This consultation addresses the issues we have identified as requiring data centre-specific solutions. A data centre assessment will therefore combine standard criteria from the BREEAM V7 New Construction (Commercial) or Refurbishment technical manuals with the data centre-specific criteria set out in this document.

    The following standard issues are currently expected to remain unchanged when applied to data centres, although feedback on their applicability is welcomed: Health and Wellbeing, Transport, Waste, and Land Use and Ecology.

  • Phased Developments and Campuses

    Data centres are sometimes built and delivered in phases, with data halls delivered and energised over several years. This creates specific challenges for assessing data centres, as different parts of the site may be completed, assessed and occupied at different times. We are seeking feedback on how BREEAM certification should operate for phased developments and campus-style projects, including the appropriate certification boundaries, the management of scheme versions over long delivery programmes and the practical implications for project teams. We also want to understand whether pricing structures should reflect data centre scale and capacity, and what approach would be most appropriate for the sector.

    The aim is to identify an approach that remains practical for projects delivered over several years while ensuring that certifications accurately reflect what has been built and assessed.

  • 8.1) Which approach to the certification of phased campuses should be adopted? Please explain.
  • Delivery and Assessor Capability

    We want to understand what makes certifying a data centre slower or more costly than it needs to be, whether this relates to scheme requirements, evidence collection, assessment processes or project delivery. This feedback will help us design a certification process that reduces unnecessary complexity while maintaining the rigour of the assessment.

  • Site access, security and confidentiality

    Data centres operate under strict access and security controls, and some of the information needed for an assessment may be commercially sensitive. We want to understand the constraints that apply to Assessors on sites and to the information they need, so that the assessment process can accommodate them without weakening the rigour of the assessment.

  • Platform, Reporting and Data Sharing

    BREEAM New Construction V7 and BREEAM Refurbishment and Fit Out have been launched on the BREEAM Platform. We want to ensure that a BREEAM Data Centre assessment and its supporting reporting are useful to the organisations that commission them and to their stakeholders, such as investors, customers and regulators. We are also seeking feedback on data sharing and benchmarking to understand how sector-level insights could be supported while respecting commercial sensitivities.

  • 11.1) Under what conditions would sharing of benchmarking and operational performance data be acceptable: Please explain any further conditions that would apply.
  • Transition Plan and Launch

    We propose a six-month transition period between the launch of the V7 data centre scheme and the closure of the existing data centre annexes to new registrations. We want to understand whether this timeframe would provide sufficient certainty for projects in development and what guidance, support and communications would help organisations transition to the new scheme.

  • Pricing

    Data centres vary significantly in size and electrical capacity. We are seeking feedback on whether certification fees should reflect this variation and, if so, what metrics and thresholds would provide the most appropriate basis for pricing.

  • Operational Certification (BREEAM In-Use)

    We are considering a dedicated BREEAM In-Use route for operational data centres in the near future. As operational performance becomes increasingly important to investors, customers, regulators and operators, we want to understand how an operational certification scheme could support the management, monitoring and improvement of data centre performance. We are seeking feedback on market demand, operational performance metrics, data availability, alignment with New Construction certification and the future role of operational certification within the sector.

  • Scoring and rating

    BREEAM scores each category using a set of weightings. We want to understand whether the standard weightings suit data centres, or whether they should be adjusted to reflect the priorities of the asset type.

  • Should be Empty: