PCL Construction, Inc.
INSPECTION REQUEST
Quality Control Entity:
PCL Construction Services, Inc.
Subcontractor:
Submittal Date:
-
Month
-
Day
Year
2 digit month, 2 digit day, 4 digit year
Date
Project Owner:
SDUSD
Project Name:
Hage ES WSM
Project Address:
9750 Galvin Ave San Diego CA 92126
Inspection Request Details (to be filled by requestor)
Inspection or testing of:
Will be ready for inspection at:
Hour Minutes
AM
PM
AM/PM Option
Date
-
Month
-
Day
Year
2 digit month, 2 digit day, 4 digit year
Date
Duration (hh:mm):
Hour Minutes
AM
PM
AM/PM Option
At the following location(s):
Built per spec. section:
Built per submittal:
Built per detail/sheet:
By submitting this Daily Inspection request, the requestor is stating the subject construction is being (or has been) built in accordance with the Prime Contract Documents, including, but not limited to, the contract drawings, specifications and addenda prepared by Roesling Nakamura Terada Architects; is ready for inspection at the indicated time; and has been (or will be) checked by the Quality Control Entity prior to Quality Assurance inspection by the Project Inspector.
Requestor's Full Name
First Name
Last Name
Requestor's Signature
COMMENTS:
PCL CONSTRUCTION, INC.
Preview PDF
Submit
Should be Empty: