• Image field 3
  • PCL Construction, Inc.

  • INSPECTION REQUEST

  • Quality Control Entity: PCL Construction Services, Inc.
  • Submittal Date:
     - -
    2 digit month, 2 digit day, 4 digit year
  • Project Owner: SDUSD
  • Project Name: Hage ES WSM
  • Project Address: 9750 Galvin Ave San Diego CA 92126
  • Inspection Request Details (to be filled by requestor)

  • Will be ready for inspection at:
  • Date
     - -
    2 digit month, 2 digit day, 4 digit year
  • Duration (hh:mm):
  • By submitting this Daily Inspection request, the requestor is stating the subject construction is being (or has been) built in accordance with the Prime Contract Documents, including, but not limited to, the contract drawings, specifications and addenda prepared by Roesling Nakamura Terada Architects; is ready for inspection at the indicated time; and has been (or will be) checked by the Quality Control Entity prior to Quality Assurance inspection by the Project Inspector.
  • PCL CONSTRUCTION, INC.
  •  
  • Should be Empty: