You can always press Enter⏎ to continue
Welcome
Hi there, please fill out and submit this form.
29
Questions
START
1
Sea spray zone
As per NZS3604:2011 Section 4 Durability, `any fixings within 500 metres of the sea need to be stainless steel in Zone D and 100 metres of tidal estuaries
Passed
Failed
Not Applicable
Previous
Next
Submit
Press
Enter
2
Consented products used
The building act requires the construction of the job to match the building consented plans.
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
3
Wrap compatible with cladding
Some Manufacturers need confirmation of whether the wrap is included as a system. eg like Marshall Waterproofing, Proclima, Jenkins Align Cladding system and so forth.
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
4
Rab board tape on all joints
As per Refer to your consent specifications for the Manufacturers specifications
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
5
Framing Inspection complete
Passed
Failed
Not Applicable
Previous
Next
Submit
Press
Enter
6
Building wraps secured and correctly overlapped
NZBC E2/AS1 9.15; 9.17 https://www.building.govt.nz/assets/Uploads/building-code-compliance/e-moisture/e2-external-moisture/asvm/e2-external-moisture-3rd-edition-amendment-10.pdf
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
7
Seal around penetrations
NZBC E2/AS1 Section 4.5 (d)
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
8
Wrap returned into openings
E2/AS1 9.1.5
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
9
Batten size
NZBC E2/AS1 9.1.8.4
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
10
Cavity base and/or head ventilation
NZBC E2/AS1 9.1.8.2
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
11
Membrane to Wall Junction Installed Correctly
NZBC E2/AS1 Page 94 Figure 62 detail, (a,b,c)
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
12
Pipes and services clear from cavity
NZBC E2/AS1 9.1.8.3 ( Comment)
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
13
Batten treatment
B2/AS1 Timber treatment be aware of polystyrene and H 3.1 Treatment contamination. Refer E2/AS1 9.1.8.4 Section (D),(E) and comment
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
14
Vermin protection
NZBC E2/AS1 9.1.8.3
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
15
Nail fixings of batten
NZSBC E2/AS1 9.1.8.4 (c) Cladding fixed through batten
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
16
Windows/doors
NZBC E2/AS1 Fig 71 and 9.1.10.3
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
17
Roof/wall junction
NZBC E2/AS1 5.1,5.2 & 8.3.9
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
18
Roof
As is often the case unless scaffolding is provided for safe access you are relying on the LBP to provide the ROW for the final.
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
19
Sill flashings detail
NZBC E2/AS1 4.0, fiqure 72; table 20
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
20
Durability of Flashings and cladding
Table 20 E2/AS1
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
21
Apron
NZBC E2/AS1 5.1 & Fiqure 7
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
22
Stop ends
Figure 85: Windows and doors for bevel-back weatherboards on cavity Paragraph 9.4.7
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
23
Parapet
E2/AS1 9.4.8 Parapets and enclosed balustrades Parapets shall be in accordance with Paragraph 6.0. Enclosed balustrades shall be in accordance with Paragraph 7.4.
Passed
Failed
Not applicable
Previous
Next
Submit
Press
Enter
24
Balconies drain (min 75mm)
NZBC E2/AS1 8.5.6 & figures 63,64
Yes
No
N/A
Previous
Next
Submit
Press
Enter
25
Balconies fall min 2 degrees
NZBC E2/AS1 8.5.1
Yes
No
N/A
Previous
Next
Submit
Press
Enter
26
Minimum 5 degree slope, parapets,barriers etc
NZBC E2/AS1 6.4 & fiqure 10
Pass
Fail
N/A
Previous
Next
Submit
Press
Enter
27
Producer statement:
Yes
No
Previous
Next
Submit
Press
Enter
28
Warranty certificate:
Yes
No
Previous
Next
Submit
Press
Enter
29
PQAS Quality Assurance System Checklist
*
This field is required.
*Click on the button below for your submission*
prev
next
( X )
My Bag
0
My Bag
Back to list
Great Product Name
$20
Quantity:
1
Size:
Small
Remove
Edit
Great Product Name
$20
Quantity:
1
Size:
Small
Remove
Edit
Great Product Name
$20
Quantity:
1
Size:
Small
Remove
Edit
Great Product Name
$20
Quantity:
1
Size:
Small
Remove
Edit
ORDER SUMMARY
15%
NZD
Subtotal
NZD
Total cost
NZD
Checklist Submission
$
50.00
NZD
+
Remove
Edit
Back
1
2
3
4
5
6
7
8
9
10
1
1
2
3
4
5
6
7
8
9
10
Quantity
Previous
Next
Submit
Press
Enter
Should be Empty:
Question Label
1
of
29
See All
Go Back
Submit