Monthly Checklist (Hosmer):
HOSMER HIGH-RISE:
*
Done:
Run sewer line connecting to laundry room (Dec-Mar-June-Sept)
YES
NO
N/A
Grease ALL zerts, inspect belts, etc. of Deschampst Unit (Dec-Mar-June-Sept.)
YES
NO
N/A
Check water softener level (add salt if necessary)
YES
NO
N/A
Clean Compactor Room/Pressure Wash, etc.
YES
NO
N/A
Clean & Organize Mechanical Room
YES
NO
N/A
Change Laundry Room dryer vent filters
YES
NO
N/A
Replace all damaged/stained ceiling tile in ALL common areas
YES
NO
N/A
Check ALL Fire Extinguishers (report error if necessary)
YES
NO
N/A
Check ALL lights in common areas (interior/exterior) & replace as needed
YES
NO
N/A
Inspect ALL water heaters
YES
NO
N/A
Inspect ALL exterior sign for deficiencies, etc.
YES
NO
N/A
Turn Main Ball Valves on/off (4 total) in the basement
YES
NO
N/A
Clean Dryer Vent System
YES
NO
N/A
All tenant utilities connected
YES
NO
N/A
Verify both Emergency Exit alarms sound
YES
NO
N/A
Verify Exterior lights adjusted for Daylight Savings (twice per year)
YES
NO
N/A
Check all splash blocks for proper alignment and not missing where needed:
YES
NO
N/A
Check all vacant units (Windows, Doors, Leaks, Utilities, Appliances, Damages, etc.
YES
NO
N/A
Report of Disconnected utilities?
Yes
No
Utilities Report:
Additional Notes:
Completed By:
*
Ron
Mark
Todd
James
Doug
Submitted By:
*
Please Select
Mark
Doug
Todd
Ron
James
For the month of:
*
Please Select
January
February
March
April
May
June
July
August
September
October
November
December
Date/Time:
-
Month
-
Day
Year
Date Picker Icon
1
2
3
4
5
6
7
8
9
10
11
12
:
Hour
00
10
20
30
40
50
Minutes
AM
PM
AM/PM Option
SUBMIT
Clear Form
Print Form
Should be Empty: