Monthly Checklist (Brewster):
BREWSTER HIGH-RISE:
*
Done:
Run sewer line behind Unit 208 (March, June, September & December)
YES
NO
N/A
Check water softener level (add salt if necessary)
YES
NO
N/A
Clean Compactor Room/Pressure Wash upper & lower level, etc.
YES
NO
N/A
Replace all damaged/stained ceiling tile in ALL common areas
YES
NO
N/A
Check ALL Fire Extinguishers (report error if necessary)
YES
NO
N/A
Check ALL lights in common areas (interior/exterior) & replace as needed
YES
NO
N/A
Inspect ALL water heaters
YES
NO
N/A
Inspect ALL exterior sign for deficiencies, etc.
YES
NO
N/A
Test boiler chemical levels
YES
NO
N/A
Check batteries in EXIT signs and emergency lights
YES
NO
N/A
Clean Dryer Vent System
YES
NO
N/A
All tenant utilities connected
YES
NO
N/A
Verify Exterior lights adjusted for Daylight Savings (twice per year)
YES
NO
N/A
Check all splash blocks for proper alignment and not missing where needed:
YES
NO
N/A
Check all vacant units (Windows, Doors, Leaks, Utilities, Appliances, Damages, etc.
YES
NO
N/A
Report of Disconnected utilities?
Yes
No
Utilities Report:
Additional Notes:
Completed By:
Ron
Todd
Doug
Mark
James
Other
Submitted By:
*
Please Select
James
Doug
Todd
Ron
Mark
For the Month of:
*
Please Select
January
February
March
April
May
June
July
August
September
October
November
December
Date/Time:
-
Month
-
Day
Year
Date Picker Icon
1
2
3
4
5
6
7
8
9
10
11
12
:
Hour
00
10
20
30
40
50
Minutes
AM
PM
AM/PM Option
Submit
Clear Form
Print Form
Should be Empty: