• CPRA Mississippi River Mid-Basin Sediment Diversion Program: Market Sounding

  • Company Information

  •  -
  • Company Background

  • Based on the information provided on CPRA's website, for a project such as this, in which of the following areas would you be interested in participating? (Check as many as apply)

  • In what capacity has your past involvement on similar coastal infrastructure projects been?

  • Have you previously participated in any of the following coastal infrastructure projects? (Check as many as apply)

  • If yes, what was your company's role?

  • Procurement and delivery model

  • Do you have a preference between CMAR and PDB?
  • For CMAR or PDB, a self-performance by a General Contractor may or may not be in CPRA's interest. If applicable, would you prefer the opportunity to self-perform construction scope?
  • Should the amount of self-performed construction be limited or required to a certain percentage of work?
  • Interest and Capacity

  • Do you consider the project to be an attractive opportunity?
  • Considering your answer above, what is your preference for packaging a project of this size?
  • Assuming CPRA applies an industry-standard approach to surety payment and performance bonding requirements, is this project too small or large from your perspective, assuming a single-project capital budget of between $700 M to $1.3 B?
  • What is the largest size project your firm is capable of bonding?
  • Are you more likely to pursue this project alone or as part of a team?
  • If as a team, would you likely be the leader or a subcontractor/ subconsultant?
  • Project Delivery Method

  • How would separate design and construction procurements using a Construction Management at risk (CMAR) impact your interest and teaming strategy for the project?

  • How would the inclusion of the design and construction scope in a single design-build procurement impact your interest and teaming strategy for the project?

  • How would the inclusion of operations and maintenance scope in either a CMAR or design-build approach impact your interest and teaming strategy for the project?

  • Project Risk Allocation

  • Based on your experience on similar projects, can you identify any risks that have been particularly difficult for you to manage in previous coastal infrastructure projects that CPRA should be certain to retain? Select all that apply.

  • Would the private sector be willing to take on any of the permitting and approvals risk for this project?
  • Design and Construction

  • The anticipated construction window, after various permitting approvals are complete, is 48 to 60 months. What are your views on the adequacy of this schedule?

  • Are there efficiencies or inefficiencies with procuring this project as single design and CMAR contracts?
  • Are there efficiencies or inefficiencies with procuring this project as a single design build contract?
  • Based on the provided summary, do you think there is potential for innovation in the design and construction of this project?
  • Summary Questions

  • Based on the project's information,how likely is it that you would participate in this project?
  • Should be Empty: