• Quote Request Form - Reports

  •  General Scheme Details

  • * It is recommended that there will be an onsite contact for the conduct of the necessary examination of your scheme. In relation to heritage listed properties, we will require an onsite contact to be present at scheme unless expressly instructed otherwise.

  • Building puropse
  • Onsite Parking
  • Scheme Type*
  • Is Onsite Manager required*
  • Is the Contact Person the same as The Body Corporate Representative?
  • Key access required*
  • Is the Person managing keys the same as The Body Corporate Representative?
  • Format: (000) 000-0000.
  • Requested Report(s) 

  • Please select the report(s) that you require.*
  • *  You do not need to submit seperate request if you need more than a report. You can choose multiple reports from the above list

  • Please upload the most current document.

  • Upload a File
    Cancelof
  • Upload a File
    Cancelof
  • Upload a File
    Cancelof
  • Upload a File
    Cancelof
  • Upload a File
    Cancelof
  • Upload a File
    Cancelof
  • Upload a File
    Cancelof
  • Upload a File
    Cancelof
  • Upload a File
    Cancelof
  • Upload a File
    Cancelof
  • Upload a File
    Cancelof
  • Upload a File
    Cancelof
  • Upload a File
    Cancelof
  • Financial Year Start Date
     - -
  • Registered for GST
  • Staged Development
  • Are lift refurbishments to be included?
  • Is painting to be included? (SFP/GTP Only) - (Please note additional charges will occur)
  • Is there any additional income applicable to the fund? (eg. communications towers or signage rentals)
  • Date Insurance Policy commenced:
     - -
  • Upload a File
    Cancelof
  • Upload a File
    Cancelof
  • * We recommend that an Asbestos Management Plan and Register be ordered at the same time as the Asbestos Survey, so as to fully cover all requirements under Workplace Health and Safety Legislation relating to Asbestos management.

  • Upload a File
    Cancelof
  • * Installation methods may vary from above due to the surfaces being fixed to, material availability and other factors

       (If no preference is specified, the material will be laminated)

  • Sinking Fund Forecast Report required by
  • Please specify the Date
     - -
  • Insurance Valuation Report required by
  • Please specify the Date
     - -
  • Safety Report required by
  • Please specify the Date
     - -
  • Asbestos Report required by
  • Please specify the Date
     - -
  • Fire Report required by
  • Please specify the Date
     - -
  • Should be Empty: