• ABUTTING LAND OWNER STATEMENT OF NON-CONSENT TO INDUSTRIAL WIND POWER PROJECT (“Non-Consent”)

  • To: Independent Electricity System Operator, IESO

    Re: Proposed Industrial Wind Turbine Power Projects

     

    WHEREAS Industrial Wind Turbine proponent companies propose to submit an application to the Independent Electricity System Operator (“IESO”) under its Large Renewable Procurement (“LRP”) to develop and operate industrial wind power projects (the “Proposed Projects”) within the Townships of North Frontenac and/or Addington Highlands;

    AND WHEREAS the undersigned is the owner of the lands identified below, which lands do or may abut the Proposed Projects (or abut the connection line to be utilized for the benefit of the Proposed Projects) (the “Abutting Lands”).

     

    NOW THEREFORE BE IT RESOLVED THAT: 

    1. The undersigned, owner of the Abutting Lands, does not support the development or operation of the Proposed Projects within the Townships of Addington Highlands and/or North Frontenac.

    2. The purpose of this Non-Consent is to evidence that the undersigned in no way supports the Proposed Projects and specifically opposes the development and operation of the Proposed Projects.

  •  - -
  • Abutting Land Owner
  • Clear
  • Should be Empty: