#103 LOCOMOTIVE PRE-OPERATION SHIFT REPORT OF INSPECTION Logo
  • #103 LOCOMOTIVE PRE-OPERATION SHIFT REPORT OF INSPECTION

    This Check List is intended for your safety and the safety of the employees working in your area & must be completed at the start of each work shift.
  • Locomotive #103

  •  - -
  •  
  •  
  •  
  • Reminders:  

    1. Mobile equipment is not to be operated at night without proper lighting.

    2. Seat belts shall always be used when operating mobile equipment.

    3. Any [NO] boxes checked, LOCO must NOT be operated (Pre-Operation check OR during operation) until condition has been corrected & documented by 2nd Pro-Operation InspectionReport. NOTIFY your Supervisor immediately.

     

  • Unsat

  • Should be Empty: