Selfbuild Rigging Requirements Logo
  • Rigging Application Form

    Please use this form to give us the details of your rigging requirements. Once we have received this information we can supply you with a quote. All rigging requirements must be notified to us no later than 3 weeks before the event.
  • PLEASE NOTE: All banners must be brought to the hall fully assembled on the day specified.

     
  • Please download this Grid Plan to draw on the exact positioning of the rigging in relation to your stand. 

     
  • Upload a File
    Cancelof
  • Browse Files
    Cancelof
  • Do you need any electrics to light your sign?

    Don't forget to order these directly with our stand contractors, Total Expo Ltd. 

     
  • Should be Empty: