SECTION I - PROJECT BACKGROUND
INTRODUCTION
PROJECT NAME
PROJECT DESCRIPTION
SCHEDULE
ESCALATION TEAM
SECTION II – SITE AUTHORIZATION, RESPONSIBILITY & ACCOUNTABILITY
AUTHORIZED PERSONNEL
ACCOUNTABILITY
RESPONSIBILITIES
SAFETY RESOURCES
SAFETY CRITICAL TASKS
SECTION III – EMERGENCY ACTION PLAN
BACKGROUND AND DUTIES
REPORTING EMERGENCIES
NEAR MISSES
FIRST AID
MEDICAL TREATMENT
ALWAYS REMEMBER
EVACUATION PLAN
CRISIS MANAGEMENT CHECKLIST & CONTACTS
MEDICAL FACILITY MAPS & INFORMATION
DRUG AND ALCOHOL SCREENING INFORMATION
SECTION IV – ACCIDENT PREVENTION
STOP WORK AUTHORITY
JOB ATTIRE AND PERSONAL PROTECTIVE EQUIPMENT
BEHAVIOR JOB SAFETY ANALYSIS
PROPER LIFTING
HOUSEKEEPING
FIRE PREVENTION AND CONTROL
COMPRESSED AIR/GAS CYLINDERS
LADDERS
ELECTRICAL
HAND AND PORTABLE POWER TOOLS
HOISTING EQUIPMENT, SLINGS AND RIGGING
PHYSICAL HAZARDS
WEATHER
VEHICLE SAFETY REQUIREMENTS
TRAFFIC CONTROL/ SIGNAGE AND BARRIERS
SECTION V – STANDARD OPERATING PROCEDURES AND SITE SPECIFIC RULES
BLACKEAGLE BASIC HSE RULES
DRUGS, ALCOHOL, FIREARMS AND PRESCRIPTION MEDICATIONS
LOCKOUT / TAGOUT
HYDROGEN SULFIDE (H2S)
EXCAVATION SAFETY
CONFINED SPACE ENTRY
WORK AROUND NON-DESTRUCTIVE TESTING
OVERHEAD POWER LINES
FALL PREVENTION AND PROTECTION GUIDELINES
RESPIRATORY PROTECTION
HOTWORK WELDING, BURNING AND CUTTING
ABRASIVE WHEEL CUTTING AND GRINDING
SECTION VI – TRAINING
BLACKEAGLE AND SUB-CONTRACTOR TRAINING
SAFETY MEETINGS
SECTION VII – HAZARD ASSESSMENTS & MITIGATION CONTROLS
APPENDIX “A” – INJURY RESPONSE PROTOCOL
APPENDIX “B” – ADDITIONAL FORMS
APPENDIX “C” – GOOD CATCH