Construction drawings of the garage are required. An architectural or engineer's seal is required only upon the requirement of the Building Code Official.
Should the area of the garage and driveway additions total over 1,000 sq ft, a storm water management plan compliant with Amity Township Ordinnace #243 must be also submitted.
Fees for the garage will be assessed upon issuance of Permit based on total square foot of building area, driveway and storm water management facilities.