RDC/FDC Execution Barriers
  • RDC/FDC Execution Barriers

    This form is to be filled out to report operational barriers that need to be tracked or escalated.
  • This form has been replaced follow link below.

    https://app.smartsheet.com/b/form/425116d42aeb4c70b9e7ea6537dc9015
  • Shipment Cube discrepancy

  • Browse Files
    Cancelof
  • Late Inbound Freight

  • Outbound Equipment

  • Outbound Tendering

  • Outbound Planning


  • LTL/GND/Load Optimization Planning

  • Browse Files
    Cancelof
  • SOS (Return Shipment)

  • Please click on to the link below and fill out the Smartsheet form for returned & found freight.

    SOS Needed - Returned/Found Freight

  • No Room

    No Room's represent a significant customer disruption. It is our goal to have zero no rooms. By answering the following questions it will help us root cause and plan better shipments.
  •  :
  • CC Load Photos

  • EP Load Photos

  • GM Load Photos

  • NG Load Photos

  • NC Load Photos

  • NT Load Photos

  • WW Load Photos

  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • Browse Files
    Cancelof
  • Split Mitigation

    Potential Splits that need resolution
  •  - -
  •  :
  • Shipment with no Shippable Pieces

  • When requesting to cancel a shipment it is always best to request pieces to be moved to the same: 

    1. Shipment method
    2. Shipment date
    3. Country of destination
  • Image-13
  • Potential No Room

    Send when you'd like to alert Planning to a potential no room.
  • Mixed Skid

    Send when you need to add HUs to just one shipment as they are all packed together
  • LAP file over 95% without notes

  •  / /
  • PSC time concerns

  • Move pieces to specific load

  • Shipping point change request

    Only for FDC use: This change request is specifically to SAVE splits out of FDCs and only if it can go airfreight or ground.
  • Should be Empty: