You can always press Enter⏎ to continue
Project Information
Please fill out as much as possible. Every little bit helps!
START
1
Project Name
*
This field is required.
Previous
Next
Submit
Press
Enter
2
Your First Name?
Who is filling out this form?
Previous
Next
Submit
Press
Enter
3
Your Last Name?
Previous
Next
Submit
Press
Enter
4
What is your email?
This is so you receive a copy of the submission. Hold onto it so you can go back and edit the project.
example@example.com
Previous
Next
Submit
Press
Enter
5
Was this a Control vs Fiber project?
If yes, please be sure to state which side had fiber in the next question.
YES
NO
Previous
Next
Submit
Press
Enter
6
Location Description
City, State, mile markers, landmarks - we should be able to find the location easily.
Previous
Next
Submit
Press
Enter
7
Project Date
Month(s) and Year is okay
Previous
Next
Submit
Press
Enter
8
Which Fiber did this project use?
FORTA-FI
SURFACE-EXT
Surface-FLEX
Other
Previous
Next
Submit
Press
Enter
9
How many pounds of fiber were required?
Previous
Next
Submit
Press
Enter
10
Please describe the Size of the project - length, tons, thickness
0/255
Huge
Large
Normal
Small
Ok
quote
Created with Sketch.
Ok
Previous
Next
Submit
Press
Enter
11
Project Type
Airport
Bridge Deck
Driveway
High Volume Road
Low Volume Road
Parking Lot
Sports/Recreation
Test Facility
Previous
Next
Submit
Press
Enter
12
Were there any existing Pavement Distresses?
Huge
Large
Normal
Small
Ok
quote
Created with Sketch.
Ok
Previous
Next
Submit
Press
Enter
13
Layer Type
Overlay-Direct
Overlay-Mill/Fill
Thin Lay (<=1”)
Full Depth
Layer-Base
Layer-Intermediate
Layer-Surface
Previous
Next
Submit
Press
Enter
14
What are the Owners expectations? Including years of extended life?
Previous
Next
Submit
Press
Enter
15
Do we know the life (in years) of the existing pavement?
Previous
Next
Submit
Press
Enter
16
Main reasons for choosing to add fiber?
Increase Life
Save $ Upfront/Reduce Thickness
Reduce Cracking
Reduce Ravelling
Reduce Rutting
Other
Previous
Next
Submit
Press
Enter
17
Was fiber a replacement for polymer, fabric, or other?
If other, what?
Previous
Next
Submit
Press
Enter
18
Select the Layers Containing Fiber:
Base
Intermediate
Wearing
Previous
Next
Submit
Press
Enter
19
Job Mix Formula:
Permeable (OGFC, PFC, etc)
Cold Patch
Dense Grade HMA
Dense Grade WMA
100% Rap
Slurry Seal
Microsurfacing
SMA
Other
Other
Previous
Next
Submit
Press
Enter
20
HMA Mix
Please Type Response
Production Temp
Row 0, Column 0
Amount of RAP
Row 1, Column 0
AC%
Row 2, Column 0
Polymer Modified?
Row 3, Column 0
Wearing Course Thickness?
Row 4, Column 0
Production Temp
Amount of RAP
AC%
Polymer Modified?
Wearing Course Thickness?
Please Type Response
Row 0, Column 0
Please Type Response
Row 1, Column 0
Please Type Response
Row 2, Column 0
Please Type Response
Row 3, Column 0
Please Type Response
Row 4, Column 0
1
of 5
Previous
Next
Submit
Press
Enter
21
WMA Mix
Please Type Response
Production Temp
Row 0, Column 0
Amount of RAP
Row 1, Column 0
AC%
Row 2, Column 0
Foaming/Admixture?
Row 3, Column 0
Thickness Placed?
Row 4, Column 0
Production Temp
Amount of RAP
AC%
Foaming/Admixture?
Thickness Placed?
Please Type Response
Row 0, Column 0
Please Type Response
Row 1, Column 0
Please Type Response
Row 2, Column 0
Please Type Response
Row 3, Column 0
Please Type Response
Row 4, Column 0
1
of 5
Previous
Next
Submit
Press
Enter
22
SMA Mix
Please Type Response
Porous Friction Course
Row 0, Column 0
OG FC
Row 1, Column 0
Used for Draindown?
Row 2, Column 0
Other:
Row 3, Column 0
Porous Friction Course
OG FC
Used for Draindown?
Other:
Please Type Response
Row 0, Column 0
Please Type Response
Row 1, Column 0
Please Type Response
Row 2, Column 0
Please Type Response
Row 3, Column 0
1
of 4
Previous
Next
Submit
Press
Enter
23
Please explain the Mix
Previous
Next
Submit
Press
Enter
24
Shareholder Info
Name and/or Company
Fiber Experience?
Owner
Row 0, Column 0
Row 0, Column 1
Engineer / Specifier
Row 1, Column 0
Row 1, Column 1
Asphalt Producer
Row 2, Column 0
Row 2, Column 1
Asphalt Contractor
Row 3, Column 0
Row 3, Column 1
Owner
Engineer / Specifier
Asphalt Producer
Asphalt Contractor
Name and/or Company
Row 0, Column 0
Fiber Experience?
Row 0, Column 1
Name and/or Company
Row 1, Column 0
Fiber Experience?
Row 1, Column 1
Name and/or Company
Row 2, Column 0
Fiber Experience?
Row 2, Column 1
Name and/or Company
Row 3, Column 0
Fiber Experience?
Row 3, Column 1
1
of 4
Previous
Next
Submit
Press
Enter
25
How were fibers added?
By Hand
Little Shot
Big Shot
Voyager
I Don't Know
Ranger
Other
Previous
Next
Submit
Press
Enter
26
Please include any additional details about this project. Was there anything that made it special?
Huge
Large
Normal
Small
Ok
quote
Created with Sketch.
Ok
Previous
Next
Submit
Press
Enter
27
Would you like to continue on to the Plant /Production Evaluation? Please select Yes - unless you are sure you cannot answer the questions or if it was a micro surfacing or slurry seal application.
(You may want to Save if you are continuing on)
YES
NO
Previous
Next
Submit
Press
Enter
28
Batch or Drum Plant?
Batch Plant
Drum Plant
Previous
Next
Submit
Press
Enter
29
Batch Drum
Time
Dry Mixing Tme
Row 0, Column 0
Wet Mixing Time
Row 1, Column 0
Dry Mixing Tme
Wet Mixing Time
Time
Row 0, Column 0
Time
Row 1, Column 0
1
of 2
Previous
Next
Submit
Press
Enter
30
RAP?
YES
NO
Previous
Next
Submit
Press
Enter
31
Drum Plant
Mixing Time
Total Mix Time
Row 0, Column 0
After Flame
Row 1, Column 0
Before Liquid
Row 2, Column 0
With RAP
Row 3, Column 0
Total Mix Time
After Flame
Before Liquid
With RAP
Mixing Time
Row 0, Column 0
Mixing Time
Row 1, Column 0
Mixing Time
Row 2, Column 0
Mixing Time
Row 3, Column 0
1
of 4
Previous
Next
Submit
Press
Enter
32
Brand name and model of the asphalt plant?
Previous
Next
Submit
Press
Enter
33
Fibers on Thermal Probe?
YES
NO
Previous
Next
Submit
Press
Enter
34
Previous Issues (i.e. dustballs)?
Previous
Next
Submit
Press
Enter
35
Bad Seals?
Previous
Next
Submit
Press
Enter
36
Other Catch Points?
Previous
Next
Submit
Press
Enter
37
Triple Drum Plant?
Previous
Next
Submit
Press
Enter
38
Parallel Flow?
YES
NO
Previous
Next
Submit
Press
Enter
39
Superheated Flights?
Previous
Next
Submit
Press
Enter
40
When using RAP?
Previous
Next
Submit
Press
Enter
41
Any clumping Issues?
YES
NO
Previous
Next
Submit
Press
Enter
42
Which fiber is clumping?
Aramid
Polyolefin
Previous
Next
Submit
Press
Enter
43
Size of clumps?
Previous
Next
Submit
Press
Enter
44
Where are they found? Equally spaced? Explain...
Previous
Next
Submit
Press
Enter
45
Is mix hot enough to melt bags (>300°)?
Previous
Next
Submit
Press
Enter
46
Is too much RAP (>20%) being used?
Previous
Next
Submit
Press
Enter
47
Is there too much moisture in RAP (%)?
Previous
Next
Submit
Press
Enter
48
Is there enough dry mixing time?
Previous
Next
Submit
Press
Enter
49
Are they using oversize bags (>1 lb)?
Previous
Next
Submit
Press
Enter
50
Is temperature high enough?
Previous
Next
Submit
Press
Enter
51
Add bags or loose fibers in pre-mix?
Previous
Next
Submit
Press
Enter
52
Not using on batch plant?
Previous
Next
Submit
Press
Enter
53
Not adding bag itself?
Previous
Next
Submit
Press
Enter
54
Utilizing low temperature mixes (optimal)?
Previous
Next
Submit
Press
Enter
55
Is air dry? No oil or water?
Previous
Next
Submit
Press
Enter
56
At least 90 psi with 25 CFM air supply?
Previous
Next
Submit
Press
Enter
57
No 90° angle bends?
Previous
Next
Submit
Press
Enter
58
Is RAP belt accessible?
Previous
Next
Submit
Press
Enter
59
Is temperature high enough?
Previous
Next
Submit
Press
Enter
60
Are fibers loose or in bags?
Previous
Next
Submit
Press
Enter
61
Are fibers wet?
Previous
Next
Submit
Press
Enter
62
Were full bags dumped at all at once? (not recommended)
Previous
Next
Submit
Press
Enter
63
No water in pipe or other obstructions?
Previous
Next
Submit
Press
Enter
64
Matching rate of plant production?
Previous
Next
Submit
Press
Enter
65
Is fiber fed directly into RAP stream?
Previous
Next
Submit
Press
Enter
66
Does generator have sufficient voltage?
Previous
Next
Submit
Press
Enter
67
Is fiber tube grounded properly?
Previous
Next
Submit
Press
Enter
68
Is rake clean?
Previous
Next
Submit
Press
Enter
69
Is plant voltage 240V and wired correctly?
Previous
Next
Submit
Press
Enter
70
Is feeder pipe disconnected at trailer at end of each day?
Previous
Next
Submit
Press
Enter
71
Is weight evenly dispersed on all load cells?
Previous
Next
Submit
Press
Enter
72
Are you comparing fiber vs. production rates (end of shift)?
Previous
Next
Submit
Press
Enter
73
Are they using a generator for electricity?
Previous
Next
Submit
Press
Enter
74
Other?
Previous
Next
Submit
Press
Enter
75
Any other information you would like to add about the plant, fiber addition, or production?
Huge
Large
Normal
Small
Ok
quote
Created with Sketch.
Ok
Previous
Next
Submit
Press
Enter
76
Would you like to continue on to the Field Evaluation section? Please select Yes - unless you are sure you cannot answer the questions.
YES
NO
Previous
Next
Submit
Press
Enter
77
Base Material?
Previous
Next
Submit
Press
Enter
78
Base Thickness?
Previous
Next
Submit
Press
Enter
79
Milling Depth?
Previous
Next
Submit
Press
Enter
80
Slag?
YES
NO
Previous
Next
Submit
Press
Enter
81
Water Lines, Pipes, Etc?
Previous
Next
Submit
Press
Enter
82
Base repair after milling?
YES
NO
Previous
Next
Submit
Press
Enter
83
Old concrete pavement underneath?
YES
NO
Previous
Next
Submit
Press
Enter
84
How long has trffic been on the milled surface before paving?
Previous
Next
Submit
Press
Enter
85
Temperatures
*Utilize one thermometer. Calibrate using non-laser only in boiling water 212 degrees.
Temperature
Inside Hopper
Row 0, Column 0
Right Behind Paver
Row 1, Column 0
At Plant on Tarp Rack (see ticket slip)
Row 2, Column 0
Inside Hopper
Right Behind Paver
At Plant on Tarp Rack (see ticket slip)
Temperature
Row 0, Column 0
Temperature
Row 1, Column 0
Temperature
Row 2, Column 0
1
of 3
Previous
Next
Submit
Press
Enter
86
Weather
Weather
Before
Row 0, Column 0
During
Row 1, Column 0
After
Row 2, Column 0
Before
During
After
Weather
Row 0, Column 0
Weather
Row 1, Column 0
Weather
Row 2, Column 0
1
of 3
Previous
Next
Submit
Press
Enter
87
Are they using a material transfer vehicle?
YES
NO
Previous
Next
Submit
Press
Enter
88
Is it a remixer?
YES
NO
Previous
Next
Submit
Press
Enter
89
Truck haul time?
Previous
Next
Submit
Press
Enter
90
Truck type?
Dump
Live Bottom
Previous
Next
Submit
Press
Enter
91
Tack Truck
Cornrows
Uniform Coverage
Puddles Everywhere
Previous
Next
Submit
Press
Enter
92
Was the paving crew continuously moving?
YES
NO
Previous
Next
Submit
Press
Enter
93
Does the paver gradually grab the truck?
YES
NO
Previous
Next
Submit
Press
Enter
94
Did the crew seem experienced (related to the application)?
YES
NO
Previous
Next
Submit
Press
Enter
95
Setting up roller pattern (did they use nuke gauge)?
YES
NO
Previous
Next
Submit
Press
Enter
96
Paving width?
Previous
Next
Submit
Press
Enter
97
Number of lanes paved?
Previous
Next
Submit
Press
Enter
98
Cold joints tacked?
YES
NO
Previous
Next
Submit
Press
Enter
99
Enough to pave without stopping?
YES
NO
Previous
Next
Submit
Press
Enter
100
If not enough, please explain:
Previous
Next
Submit
Press
Enter
101
Roller/ Compaction Speed?
Previous
Next
Submit
Press
Enter
102
Roller/ Compactor going straight?
YES
NO
Previous
Next
Submit
Press
Enter
103
Any sharp turns?
Previous
Next
Submit
Press
Enter
104
Roller parking on mat close to paver?
Previous
Next
Submit
Press
Enter
105
Number of rollers in operation?
Previous
Next
Submit
Press
Enter
106
How soon after finish roller was traffic moved onto new pavement?
Previous
Next
Submit
Press
Enter
107
Please describe anything odd about he operation or issues that may have occurred...
Huge
Large
Normal
Small
Ok
quote
Created with Sketch.
Ok
Previous
Next
Submit
Press
Enter
108
Please include High Quality Pictures
Please upload pictures - if you need to send more than this will allow, please contact Marketing.
Drag and drop files here
Select files to upload
Max. file size
: 10.6MB
Browse Files
Cancel
of
Previous
Next
Submit
Press
Enter
109
Did you receive any Customer Testimonials that we are able to quote? If yes, please list what they said and who they were.
Previous
Next
Submit
Press
Enter
110
Did you get any permissions for FORTA to use names or information in a Project Profile? If No, we will still create a one, it will just be more generic.
*
This field is required.
Previous
Next
Submit
Press
Enter
111
Did you receive permission for FORTA to use the pictures provided? If you select No, we will edit logos and faces from the images.
*
This field is required.
YES
NO
Previous
Next
Submit
Press
Enter
112
How happy were you with this job overall?
Row 0, Column 0
Row 0, Column 1
Row 0, Column 2
Row 0, Column 3
Row 0, Column 4
Row 0, Column 0
Row 0, Column 1
Row 0, Column 2
Row 0, Column 3
Row 0, Column 4
Previous
Next
Submit
Press
Enter
113
Anything else to add before you hit Submit?
Huge
Large
Normal
Small
Ok
quote
Created with Sketch.
Ok
Previous
Next
Submit
Press
Enter
Should be Empty:
Question Label
1
of
113
See All
Go Back
Submit