Question |
Comment |
Entrance protection in place |
ensure entrance protection is in place, it is secure and undamaged. There should be no gaps that allows materials to fall down the lift shaft |
Hand tools checked and fit for purpose |
check for none approved tooling and remove then replace damaged tooling |
Voltage tester and proving unit (together and available) |
check both the tester and the proving unit are on site together and not stored separately in the van. Check the condition of the leads and the probes to ensure they have caps on to prevent excess metal protruding |
Power Tools (condition) & PAT Test within date |
check condition and remove damaged tooling |
Vacuum attachment for drill on site |
check vacuum attachment is on site and not in van |
Lifting equipment Chain Blocks Slings Accessories |
check the engineer does not have any none approved accessories (i.e. accessories not provided as part of installation kit or provided by Hire company) hidden away in tool box |
Daily Weekly check sheet completed & Attached to Tirak / handrail |
check that document is completed |
Demonstrate take 2 & Activate ASGT |
ask engineer to explain principles of take 2 and demonstrate checks |
Hand set condition, Functionality & Safety Rules |
check for damage including cable casing and buttons - ensure handset is not left on site |
Check OSG (rope is on small groove & installed correctly) |
check |
Temporary power supply, Yellow Wedge & RCD Check |
activate RCD and ensure it is secured safely and the cable is secured in the yellow wedge and free in shaft |
Lifting eyes installed & marked up correctly |
check lifting eyes are marked up with SWL, unique id number to match certification and they are marked for man riding |
Lift shaft Activities & Housekeeping |
is the shaft tidy and tooling and equipment adequately stored |
Shaft Lighting (check damaged bulbs or missing cages) |
check condition looking for damaged bulbs and missing cages |
Installation kit number |
record number |
Kit expiry date |
record date. If invalid stop work activity |
Tirak Number |
record number |