Cotton Ranch Design Review Committee
CONSTRUCTION REQUIREMENTS
I have read Chapter 7 of the Cotton Ranch design guidelines and will comply with the construction practices of Cotton Ranch & Sky Legend.
An approved construction sign must be installed prior to construction with Cotton Ranch or Sky Legend logo and the following information: Lot, Block, Filing, and Street Address Owner or Project Name General Contractor, Address, Phone Architect/Designer, Address, Phone Building Permit “For Information Call”, Phone #
Each construction site must have a construction and/or silt fence on 3 sides.
Each construction site must have a temporary toilet.
Each construction site must have a dumpster.
Construction activities will be limited to the time period between 7:00 a.m. and 7:00 p.m. during the week, between 8:00 a.m. and 5:00 p.m. on Saturdays and will be prohibited on Sundays and holidays.
Contact Cotton Ranch Metro District prior to any construction to locate the non-potable water system. Contact Operations Manager for CR Metro District, Chris Meister, 970-390-6131
All field changes shall be submitted to the Committee prior to site installation. This includes but is not limited to all exterior changes including site work, landscaping, exterior detailing, materials colors.
During construction, provide a mock-up of actual building materials and colors prior to installation of these items. Please contact the DR Administrator & allow a minimum of 2 weeks for approval by the committee.
Project Address/Lot
Date of Final Design Meeting:
/
Month
/
Day
Year
Date
Name of Applicant/Representative Present at Meeting:
Signature of Applicant
Owner Signature
Signature confirms that you have read and understand the above requirements.
Preview PDF
Submit
Should be Empty: