• COTTON RANCH METROPOLITAN DISTRICT

    28 Second St, Suite 213, Edwards, CO 81637
  • TAP FEE APPLICATION

  • Construction Deposit: $2,500

  • Tap Fee Due: $2,850

  • Total Fees Due: $5,350

  • Please make checks payable to:

    Cotton Ranch Metropolitan District

    28 Second Street, Suite 213

    Edwards, CO 81632

  • Tap fees are $2,850 per unit on an individual lot and are due prior to tapping onto the District raw water irrigation system. The applicant is responsible for purchasing and installing a meter. (Please see attached Exhibit A-1 of the Districts Rules and Regulations

  •  
  • Should be Empty: