St. Marys Building Inspection Request
Please note that all building inspections/documents must be requested and submitted using this form. Inspections must be submitted no later than 2pm the day prior to inspection date. If any inspection(s) needs to be canceled or rescheduled, please submit requests using this form. Please upload any documents related to the project as "Submit Documents".
Permittee (Contractor/Owner)
*
First Name
Last Name
Email for response
*
example@example.com
If you would like the response sent to a second email, enter the email below.
example@example.com
Permit Number (Must Match Permit Address)
*
Please only provide one permit number
Permit Location (Site Address)
*
Please only provide one address
Inspection Date Requested
*
-
Month
-
Day
Year
Please select inspection/ reinspection date
Request Inspections Below
Please select all inspection(s) requested to be conducted for the property stated above. Please check all that apply. If requesting a cover up inspection, please make sure to select the following inspection requests if applicable: Framing, strapping, gas vent, gas piping, rough in plumbing, rough in mechanical, rough in electrical, windows, and doors. *All requests must be checked in order to be scheduled. If requesting a final inspection for issuance of a Certificate of Occupancy, please be sure to select all five "final" inspections. Please allow 24 hours to process CO after completion of approved final inspections.
Submission Type
*
New Inspection(s)
Reinspection(s)
Cancel Inspection
Submit Document(s)
Reschedule Inspection
Are you requesting for a Specialty or Single Permit
Pools/Spas
Enclosures/Screen Rooms/Porches
Windows
Solar Panels
Generators
Garage/Shed
Docks
Seawall/Bulkhead/Retaining Wall
Electrical Reconnection ONLY
Fences
FIRE INSPECTION
Building Inspections
Footings
Piers/CMU Walls
Slab
Nail Off (Roof & Walls)
Window
Door
Framing
Insulation
Strapping
Building Final (Required for C.O.)
Electrical Inspections
Temp Pole
Rough Electric/Grounding
Pre-Final
Low Voltage Final (Required for C.O.)
Electrical Final (Required For C.O.)
Plumbing Inspections
Pre-Slab PLUMBING
Rough Plumbing
Gas Piping/Vent/Ground
Sewer connect (To City)
Plumbing Final (Required For C.O.)
HVAC/ Mechanical Inspections
Rough HVAC
HVAC Final (Required For C.O.)
Lot & Landscaping Inspections
Driveway (Prior To Pouring)
Final Lot Grading and E&S Stabilization (Required For C.O.)
PRE-final lot grading Inspection (if needed)
Inspection Report(s)/Documents To Submit
Browse Files
Drag and drop files here
Choose a file
Please attach any related documents necessary for the issuance of a Certificate of Occupancy (Termite reports, compaction reports, etc.)
Cancel
of
Attached Documents (Required for C.O.)
Termite Treatment
Final Elevation Certificate
GA Gas Compliance Letter
Lot Inspection Report
Door Blower Report
GA Energy Code Certificate
Other
Comments/notes about inspections requested
Print
Submit
Should be Empty: