• Image-40
  • Suspension Retrofit

    This form acts as an initial enquiry for Retrofit, a tentative quote can be provided on receipt of this form. 

    Once evaluated a physical inspection of the caravan / trailer is required before a finalised quote or acceptance of the job can occur. 

    Standard Lead Time:

    Approx. 3 Weeks from acceptance of Formal Quote (Post inspection)

  •  - -
  • Date provided is a request only, date to be confirmed on response from the Towing Performance Centre Team.

  • Photo Requirements

    To assist with remotely evaluating the retrofit requirements of this job we would strongly suggest attaching some photos of the caravans underbody at time of submission. 

    These images will be used to confirm the suspension type currently fitted as well as identify any potential obstructions (water tanks, plumbing, electrical etc). 

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • When taking a photo of the suspension system we recommend taking the photo from a low angle at the rear of the back tyre, shooting the photo of the suspension system on the opposite side of the caravan/trailer.

  • Should be Empty: