ScanOnline - Enterprise Network Installation Questionnaire
  • ScanOnline - Enterprise Network Installation Questionnaire

  • IT Team Information - Corporate IT, Onsite IT or Contractor To Note

  •  -
  • Onsite GM/Onsite Point of Contact For Project

  •  -
  • Customer Location (NOTE: Where Project Will Take Place)

  • Is This a Multi-Site Project?

  • Browse Files
    Cancelof
  • Has a Wireless Site Survey been completed at the Facility?

  • Can we get a copy of the completed site survey?

  • Will a lift be required?

  • You selected "ScanOnline to provide lift".

    Please Answer These Additional Follow Up Questions...

  • If ScanOnline provides the lift, what is required for the survey?

  • If ScanOnline provides the lift, are there further lift type requirements?

  • You Have Selected "Customer Provides Lift".

    Disclaimer:

    Customer assumes responsibility to provide a dedicated, operational lift in good working order that is the correct size/height needed for the work for the WLAN project. Any delays regarding these requirements will be subject to additional charges. These charges will be for procuring a lift and any associated scheduling delays.

    Please Answer These Additional Follow Up Questions...

  • Will this lift be dedicated during the survey?

  • Are there any safety requirements?

  • Liability/Proof of Insurance?

  • Working at heights permits?

  • Will any new MDF/IDF locations be required to complete the installation?

  • Have electrical power requirements been discussed for additional MDF/IDF?

  • Have electrical power requirements been discussed for outdoor AP's?

  • Is a managed services contract being considered for the site?

  • Will ScanOnline be contracted to configure and/or stage the wireless equipment?

  • You have selected "Yes".  The following information will need to be supplied two weeks prior to installation or reciept of hardware if not entered here:

  • IP address for access points?
  • Administrator Credentials:

  • If new POE switches are being installed, are we (ScanOnline) responsible for the configuration?

  • You selected "Yes", please provide the following switch configuration/administrator credential information:

  • Will current firmware be available for install?

  • Are there naming convention requirements for the MDF/IDF's and AP's for the project?

  • Who is responsible for labeling?
  • If ScanOnline is responsible for labeling, Please provide how you would like this to be accomplished and the convention that you wish to use for labeling the following item types:

  • You have selected "no".  Additional follow up questions...

  • Where will the controller be?
  • Is an existing wireless network already operating on-site?

  • Will the old network need to run concurrently with the new?

  • Who will we be responsible for removing the old access points?

  • What type of applications will be used with the new WLAN (Choose all that apply)

  • Will there be any security clearances needed?

  • Is there any safety gear required to perform the installation? (Choose all that apply)

  • Proposed time frame for the project:

  • If conduit is to be installed by electrician or other subcontractor(s)...

  •  - -
  •  - -
  • Will ScanOnline be able to work outside the normal first shift hours and weekends if needed?

  • Should be Empty: