Complete this checklist a day or two before the job begins to ensure all materials, equipment, and supplies are staged and ready for work.
Your Name
Job Name
Pad staged (5-day supply, palletized correctly, 9 rolls per pallet, pallets stable and shrink wrapped)
Yes
No
Carpet staged (5-day supply of carpet, rolls/tiles match phasing map, roll numbers, seaming diagram)
Yes
No
Adhesive staged (5-day supply, both adhesive types, stored per temperature requirements)
Yes
No
Pallet Jack moved to staging area, plugged in and charging
Pallet Jack moved to staging area, plugged in and charging
Slot Jacks & Trusses moved to staging area and inspected
Slot Jacks & Trusses moved to staging area and inspected
Demo Machine moved to staging area
Demo Machine type
Electric
Propane
Confirm demo machine blades are in good condition
3 House Brooms moved to staging area
1 Fine Push Broom moved to staging area
2 Crain Stand-Up Carpet Cutters moved to staging area
Extra Ride-on Machine Blades staged (12" blades and self-dicing blades)
Squeegees (3) staged (required for 2010U pad jobs only)
Trowels 1/16" x 1/16" x 1/16" V-notch staged (required for 2580 pad jobs)
2 Hand Scrapers moved to staging area
2 Floor Fans moved to staging area
Seam Sealer staged
Seam Tape staged
Trash Bags staged (minimum 10 bags)
Duct Tape staged (minimum 2 rolls)
Pallets staged (minimum 6 pallets to start the job)
Flour staged (2 bags – used to neutralize existing glue during demolition)
Materials organized for easy crew access
Walk paths remain clear and safe
Materials protected from clients and damage from other trades
Demo pallets positioned where demo crew can load quickly
Confirm 5-day supply of materials staged
Confirm tools and equipment ready
Confirm consumable supplies stocked
Confirm staging area organized
Crew will be able to start work immediately with no delays