• Weekly Staging Checklist

    Complete this checklist a day or two before the job begins to ensure all materials, equipment, and supplies are staged and ready for work.
  • Pad staged (5-day supply, palletized correctly, 9 rolls per pallet, pallets stable and shrink wrapped)
  • Carpet staged (5-day supply of carpet, rolls/tiles match phasing map, roll numbers, seaming diagram)
  • Adhesive staged (5-day supply, both adhesive types, stored per temperature requirements)