SURVIVAL - S25 Camp Induction Day Checklist Logo
  • Camp Induction Day Checklist

    Please make sure to fill out all sections
    • Prepare Camp 
    • Erect Bell Tents 
    • Inventory Kit 
    • Risk Assessment 
    • With all risk assessments, refer to RA guidance, and systematically assess the areas we use, record any hazards present and control measures to be implemented. If an unacceptable risk remains, (high) contact Ops Manager for further guidance and do not use area until further control measures are introduced. If in doubt contact UAC head office for advice.

    • Fire Procedure 
    • Camp Paperwork 
    • US Sign In Area 
    • Outdoor Signage and Branding 
    • Hidden Section 
    • Should be Empty: