Documents Required for a Building Permit - Demolition Logo
  • Documents Required for a Building Permit

    Demolition
  • Please use this as a guide. For project specific advice or questions, please email us at admin@wilbybc.com.au

  • What You Need

    PLEASE NOTE: Checklist items you label as "Attached" must be uploaded at the end of this form.
  • An application for a building permit must be accompanied by plans that address the requirements of Part 4, Division 2 of the Building Regulations 2018. Please ensure your plans include the following information (as a minimum):

    • Scaled site plan showing:
      • site levels
      • the building/s being demolished
      • the street
      • a north point
      • buildings on adjoining properties
      • set back distances from the proposed work to other buildings and property boundaries
    • Floor plan
    • Photographs of each elevation of the building being demolished/removed
  • Attach Documents

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Should be Empty: