Connectivity Plan (Part R) Submission
Complete this form to submit the Connectivity Plan for new housing under Building Regulations 2010, Approved Document R. Please fill all relevant sections and upload supporting evidence as required.
Part A – Infrastructure and Contact Details
Building control body name (local authority or approved inspector)
*
Building control application number
*
Development/address/plot number(s) (Include further phases if applicable)
*
Developer key person full name
*
First Name
Last Name
Developer company/organisation
*
Developer address
*
Developer email
*
example@example.com
Developer telephone/mobile number
*
Please enter a valid phone number.
Format: (000) 000-0000.
Network operator contact name
*
First Name
Last Name
Network operator company/organisation
*
Network operator address
*
Network operator email
*
example@example.com
Network operator telephone/mobile number
*
Please enter a valid phone number.
Format: (000) 000-0000.
Network operator reference number (of contract/transaction with developer)
5a. Will you provide each dwelling on the development site with gigabit-ready physical infrastructure from the network termination point at each dwelling to the network distribution point?
*
Yes
No
5b. Will you provide each dwelling with gigabit-ready physical infrastructure from a network termination point to a point as close as is reasonably practicable to a current or likely future location of a network distribution point?
*
Yes
No
5c. Will you provide each dwelling with gigabit-ready physical infrastructure from a network termination point to an access point or common access point?
*
Yes
No
5d. Will you provide each dwelling with connection to a gigabit-capable public electronic communications network?
*
Yes
No
Evidence to support section 5 (Include written confirmation from a suitable provider, technology details, and any relevant explanations)
*
Upload broadband quotes and supporting evidence
Upload a File
Drag and drop files here
Choose a file
Cancel
of
Part B – Exemptions (Complete only if applicable)
1a. Is/are the building(s) exempt from the requirement to install gigabit-ready physical infrastructure (RA1)?
Yes
No
1b. Exemption reason: The building(s) is/are to be occupied by the Ministry of Defence, armed forces, or for national security purposes.
MOD/armed forces/national security
1c. Exemption reason: Area isolated from a relevant public electronic communications network, cost exceeds cap, and prospect of connection too remote.
Isolated area, cost exceeds cap, and connection too remote
Evidence of exemption (RA1)
Upload evidence for exemption (RA1)
Upload a File
Drag and drop files here
Choose a file
Cancel
of
3a. Is/are the building(s) exempt from the requirement to provide a connection to a gigabit-capable public electronic communications network (RA2)?
Yes
No
3b. Cost to provide each dwelling with the following exceed(s) the cost cap (tick all that apply):
Gigabit-capable public electronic communications network connection
High-speed public electronic communications network connection
USO-standard public electronic communications network connection
3c. At least two suitable providers declined or failed to respond within 30 working days.
At least two suitable providers declined or failed to respond
Evidence of exemption (RA2)
Upload evidence for exemption (RA2)
Upload a File
Drag and drop files here
Choose a file
Cancel
of
Submit Connectivity Plan
Should be Empty: