• PRE-POUR CHECKLIST

    PRE-POUR CHECKLIST

    SUSPENDED DECK FORMWORK INSPECTION
  • Date:*
     / /
  • INSPECTION ITEMS

  • 1. PSI completed and signed off by all workers and foreman.*
  • 2. Safe work access identified.*
  • 3. Openings properly covered.*
  • 4. Access prohibited under suspended deck and is barricaded with caution tape and signage.*
  • 5. Pour Watch assigned to supervise area beneath active pour.*
  • 6. Formwork constructed/erected in accordance with engineered drawings.*
  • 7. Concrete specifications and permissible construction loads confirmed with engineered drawings.*
  • 8. Formwork materials and components have been verified for: proper type, grade, size, orientation, and manufacturers specifications.*
  • 9. Supporting structures/surfaces in good condition and free of defects.*
  • 10. Supporting structures/surfaces confirmed for strength to support construction loads.*
  • 11. All formwork materials and components are in good condition and free of defects.*
  • 12. Formwork has been constructed plumb, level, squared, tight, and free of visible gaps.*
  • 13. All connections checked for proper fit and are secure to formwork and/or supports.*
  •  