You can always press Enter⏎ to continue
Acoustic Enclosure Design Checklist
Hi there, please complete and submit this form to receive a PDF copy with your answers.
31
Questions
START
1
Email
Re-enter your email to receive the PDF after submission
example@example.com
Previous
Next
Submit
Press
Enter
2
Select your project's current phase
Pondering my options
Feasability study / pre-engineering
Budget evaluation
Ready to order (execution)
Previous
Next
Submit
Press
Enter
3
What approximate date are you looking to have this installed?
If the project end date is unknown, leave this field blank and click Next
-
Date
Year
Month
Day
Previous
Next
Submit
Press
Enter
4
Do you have a budget in mind?
0 to $10 000
$10 000 to $29 999
$30 000 to $49 999
$50 000 to $99 999
$100 000 to $199 999
$200 000 and above
To be determined
Previous
Next
Submit
Press
Enter
5
What type of equipment / machinery needs to be enclosed?
(process, brand, product number, details, etc.)
Previous
Next
Submit
Press
Enter
6
Do you have a rough sketch or layout available or your project?
If so, you can upload your layout here
Drag and drop files here
Select files to upload
Max. file size
: 10.6MB
Browse Files
Cancel
of
Previous
Next
Submit
Press
Enter
7
Will the installation be indoors or outdoors?
Indoors
Outdoors
Previous
Next
Submit
Press
Enter
8
Does the project require noise control?
YES
NO
Previous
Next
Submit
Press
Enter
9
What is the sound attenuation required?
Required sound isolation / soundproofing
Please Select
STC 35
STC 40
STC 45
STC 50
STC 58
STC 62
To be determined
Please Select
Please Select
STC 35
STC 40
STC 45
STC 50
STC 58
STC 62
To be determined
Desired attenuation, if known
Exposed sound level (dBA), if known
Previous
Next
Submit
Press
Enter
10
Are there other hazards to mitigate?
To protect equipment inside or employees outside the enclosure
YES
NO
Previous
Next
Submit
Press
Enter
11
What type of hazards?
Select all that apply
Previous
Next
Submit
Press
Enter
12
Give as much detail as possible about the hazards you wish to mitigate
Huge
Large
Normal
Small
Ok
quote
Created with Sketch.
Ok
Previous
Next
Submit
Press
Enter
13
Enclosure dimensions
Length (ft) - Width (ft) - Height (ft)
Previous
Next
Submit
Press
Enter
14
What will be the supporting structure for your project?
Installed directly on ground floor
Installed on a raised structure or mezzanine
Previous
Next
Submit
Press
Enter
15
Structure installed directly on ground floor on...
Reinforced concrete
Concrete on metal deck
Steel structure
Other
Previous
Next
Submit
Press
Enter
16
Installed on a raised structure or mezzanine
Tell us who supplys the raised structure / mezzanine + the height/elevation
Please Select
Client
MECART
Please Select
Please Select
Client
MECART
Who would be in charge of supplying the raised structure / mezzanine?
Height / Elevation
Previous
Next
Submit
Press
Enter
17
Do you need to be able to enter the enclosure completely, or do you just need a small access (like a door, or access trap) for maintenance?
YES
NO
Previous
Next
Submit
Press
Enter
18
Door - Part 1
All door options
Please Select
MECART standard
Specific brand
Please Select
Please Select
MECART standard
Specific brand
Hardware
Hardware - If not MECART, specify which brand you want
Please Select
Yes
No
Please Select
Please Select
Yes
No
Automatic door required (door operator)
Number of single swing doors
Number of double swing doors
Number of single sliding doors
Number of double sliding doors
Previous
Next
Submit
Press
Enter
19
Door - Part 2
All door options
Please Select
MECART standard
Specific brand
Please Select
Please Select
MECART standard
Specific brand
Airlock entry required
Please Select
Yes
No
Please Select
Please Select
Yes
No
If so, is an interlock system required (prevents both doors from opening at the same time)
Please Select
Magnetic lock
Key lock with deadbolt
Pin lock
Multiple / Other
Please Select
Please Select
Magnetic lock
Key lock with deadbolt
Pin lock
Multiple / Other
Required lockset type
If multiple lock types are needed or if your preferred type isn't listed, please list them all here
Previous
Next
Submit
Press
Enter
20
Does the project require windows?
Yes
No
To be determined
Previous
Next
Submit
Press
Enter
21
Window sizes
Select from the available window sizes. Select all that apply
36'' x 42''
36'' x 60''
48'' x 42''
48'' x 60''
80'' x 42''
Custom
Previous
Next
Submit
Press
Enter
22
Custom window sizes
If you need multiple window sizes, list them all
Previous
Next
Submit
Press
Enter
23
What color would you like for your project?
What color do you want for your modular panels?
Please Select
MECART standard light grey
MECART standard white
Other
Please Select
Please Select
MECART standard light grey
MECART standard white
Other
If the answer is other, please describe (RAL or pantone reference are preferred) - custom colors
Previous
Next
Submit
Press
Enter
24
Electrical and telecom praparation 1/2
Amount
Any particularities?
Electrical receptacle, 120V-15A
Row 0, Column 0
Row 0, Column 1
Electrical receptacle, 120V-20A
Row 1, Column 0
Row 1, Column 1
Data / Network preparations
Row 2, Column 0
Row 2, Column 1
Floor openings for cable passage
Row 3, Column 0
Row 3, Column 1
Electrical receptacle, 120V-15A
Electrical receptacle, 120V-20A
Data / Network preparations
Floor openings for cable passage
Amount
Row 0, Column 0
Any particularities?
Row 0, Column 1
Amount
Row 1, Column 0
Any particularities?
Row 1, Column 1
Amount
Row 2, Column 0
Any particularities?
Row 2, Column 1
Amount
Row 3, Column 0
Any particularities?
Row 3, Column 1
1
of 4
Previous
Next
Submit
Press
Enter
25
Electrical services and telecom preparation 2/2
If unknown or nothing to add, leave blank and press next
Please add any other electrical requirements needed
Previous
Next
Submit
Press
Enter
26
Mechanical/HVAC
Please Select
Provided by MECART
Provided by another supplier
None
To be determined
Please Select
Please Select
Provided by MECART
Provided by another supplier
None
To be determined
Does MECART needs to supply HVAC equipment?
If provided by MECART, what are your HVAC requirements (fresh air, cooling tonnage, etc.)
Previous
Next
Submit
Press
Enter
27
Plumbing preparation
Please Select
Yes
No
To be determined
Please Select
Please Select
Yes
No
To be determined
Is plumbing preparation needed?
If yes, please specify what’s needed
Previous
Next
Submit
Press
Enter
28
Fire detection/suppression preparation
Please Select
Yes
No
To be determined
Please Select
Please Select
Yes
No
To be determined
Horn strobe preparation
Please Select
Yes
No
To be determined
Please Select
Please Select
Yes
No
To be determined
Detector preparation (smoke or heat)
Sprinkler preparation *Fire detection/suppression components to be installed by licensed contractor at site
Previous
Next
Submit
Press
Enter
29
Delivery and installation
Please Select
Yes
No
Unknown
Please Select
Please Select
Yes
No
Unknown
Is it part of a construction project?
Please Select
Yes
No
Unknown
Please Select
Please Select
Yes
No
Unknown
Are receiving docks available for the delivery?
Please Select
Ground floor
Other
Please Select
Please Select
Ground floor
Other
On which floor level is the project?
If not on ground floor, what kind of elevator and/or lifting equipment are available. Please describe.
Previous
Next
Submit
Press
Enter
30
What's your priority?
Please check all that apply
Price / Budget
Lead Time
Acoustics / Noise Isolation
Robustness / Product Lifespan
Modularity / Movability
Other
Previous
Next
Submit
Press
Enter
31
Please verify that you are human
*
This field is required.
Previous
Next
Submit
Press
Enter
Should be Empty:
Question Label
1
of
31
See All
Go Back
Submit