You can always press Enter⏎ to continue
Modular Room Design Checklist
Please complete and submit this form to receive a PDF copy with your answers.
35
Questions
START
1
Email
Re-enter your email to receive the PDF after submission
example@example.com
Previous
Next
Submit
Press
Enter
2
Select your project's current phase
Pondering my options
Feasability study / pre-engineering
Budget evaluation
Ready to order (execution)
Previous
Next
Submit
Press
Enter
3
What approximate date are you looking to have this installed?
If project date is unknown, leave blank and press next
-
Date
Year
Month
Day
Previous
Next
Submit
Press
Enter
4
Do you have a budget in mind?
0 to $10 000
$10 000 to $29 999
$30 000 to $49 999
$50 000 to $99 999
$100 000 to $199 999
$200 000 and above
To be determined
Previous
Next
Submit
Press
Enter
5
What type of modular room do you require for your project?
Select all that apply
Control room
Operator cabin / Pulpit
In-plant office
Breakroom / Lunchroom
Modular lab (QA lab, wet lab, etc.)
Other
Previous
Next
Submit
Press
Enter
6
Do you have a rough sketch or layout available or your project?
If so, you can upload your layout here
Drag and drop files here
Select files to upload
Max. file size
: 10.6MB
Browse Files
Cancel
of
Previous
Next
Submit
Press
Enter
7
Will the installation be indoors or outdoors?
Indoors
Outdoors
Previous
Next
Submit
Press
Enter
8
Does the project require noise control?
YES
NO
Previous
Next
Submit
Press
Enter
9
What is the sound attenuation required?
Required sound isolation / soundproofing
Please Select
STC 35
STC 40
STC 45
STC 50
STC 58
STC 62
To be determined
Please Select
Please Select
STC 35
STC 40
STC 45
STC 50
STC 58
STC 62
To be determined
Desired attenuation, if known
Exposed sound level (dBA), if known
Previous
Next
Submit
Press
Enter
10
Are there other hazards to mitigate?
YES
NO
Previous
Next
Submit
Press
Enter
11
What type of hazards?
Select all that apply
Previous
Next
Submit
Press
Enter
12
Give as much detail as possible about the hazards you wish to mitigate
Huge
Large
Normal
Small
Ok
quote
Created with Sketch.
Ok
Previous
Next
Submit
Press
Enter
13
General dimensions
Length (ft) - Width (ft) - Height (ft)
Room 1
Room 2, if applicable
Room 3, if applicable
Previous
Next
Submit
Press
Enter
14
Configuration - Assembled on-site or Preassembled
Premanufactured modular panels delivered & assembled on-site
Preassembled at MECART, delivered as one unit on site
Previous
Next
Submit
Press
Enter
15
What will be the supporting structure for your project?
Installed directly on ground floor
Installed on a raised structure or mezzanine
Previous
Next
Submit
Press
Enter
16
Structure installed directly on ground floor on...
Reinforced concrete
Concrete on metal deck
Steel structure
Other
Previous
Next
Submit
Press
Enter
17
Installed on a raised structure or mezzanine
Tell us who supplys the raised structure / mezzanine + the height/elevation
Please Select
Client
MECART
Please Select
Please Select
Client
MECART
Who would be in charge of supplying the raised structure / mezzanine?
Height / Elevation
Previous
Next
Submit
Press
Enter
18
Floor
No MECART floors, walls installed directly on supporting structure
MECART floors (required for preassembled product)
Previous
Next
Submit
Press
Enter
19
Floor finish
Please Select
MECART standard vinyl tile
MECART standard carpet
None/supplied by others
Other floor finish requirements
To be determined
Please Select
Please Select
MECART standard vinyl tile
MECART standard carpet
None/supplied by others
Other floor finish requirements
To be determined
If your answer is other floor finish requirements, please give more details about what is required
Previous
Next
Submit
Press
Enter
20
Door - Part 1
All door options
Please Select
MECART standard
Specific brand
Please Select
Please Select
MECART standard
Specific brand
Hardware
Hardware - If not MECART, specify which brand you want
Please Select
Yes
No
Please Select
Please Select
Yes
No
Automatic door required (door operator)
Number of single swing doors
Number of double swing doors
Number of single sliding doors
Number of double sliding doors
Previous
Next
Submit
Press
Enter
21
Door - Part 2
All door options
Please Select
MECART standard
Specific brand
Please Select
Please Select
MECART standard
Specific brand
Airlock entry required
Please Select
Yes
No
Please Select
Please Select
Yes
No
If so, is an interlock system required (prevents both doors from opening at the same time)
Please Select
Magnetic lock
Keylock with deadbolt
Pin lock
Multiple
Other
Please Select
Please Select
Magnetic lock
Keylock with deadbolt
Pin lock
Multiple
Other
Required lockset type
If multiple lock types are needed or if your preferred type isn't listed, please list them all here
Previous
Next
Submit
Press
Enter
22
Does the project require windows?
Please Select
Yes
No
To be determined
Please Select
Please Select
Yes
No
To be determined
Previous
Next
Submit
Press
Enter
23
Window sizes
Select from the available window sizes. Select all that apply
48'' x 42''
36'' x 42''
48'' x 60''
36'' x 60''
80'' X 42''
Custom size
Previous
Next
Submit
Press
Enter
24
Custom window sizes
If you need multiple window sizes, list them all
Previous
Next
Submit
Press
Enter
25
What color would you like for your project?
What color do you want for your modular panels?
Please Select
MECART standard light grey
MECART standard white
Other
Please Select
Please Select
MECART standard light grey
MECART standard white
Other
If the answer is other, please describe (RAL or pantone reference are preferred) - custom colors
Previous
Next
Submit
Press
Enter
26
Electrical and telecom preparation - Part 1
Amount
Any particularities?
Electrical receptacle, 120V-15A
Row 0, Column 0
Row 0, Column 1
Electrical receptacle, 120V-20A
Row 1, Column 0
Row 1, Column 1
Data / Network preparations
Row 2, Column 0
Row 2, Column 1
Floor openings for cable passage
Row 3, Column 0
Row 3, Column 1
Electrical receptacle, 120V-15A
Electrical receptacle, 120V-20A
Data / Network preparations
Floor openings for cable passage
Amount
Row 0, Column 0
Any particularities?
Row 0, Column 1
Amount
Row 1, Column 0
Any particularities?
Row 1, Column 1
Amount
Row 2, Column 0
Any particularities?
Row 2, Column 1
Amount
Row 3, Column 0
Any particularities?
Row 3, Column 1
1
of 4
Previous
Next
Submit
Press
Enter
27
Electrical services and telecom preparation - Part 2
If unknown or nothing to add, leave blank and press next
Please add any other electrical requirements needed
Previous
Next
Submit
Press
Enter
28
Mechanical/HVAC
Please Select
Provided by MECART
Provided by another supplier
None
To be determined
Please Select
Please Select
Provided by MECART
Provided by another supplier
None
To be determined
Does MECART needs to supply HVAC equipment?
If provided by MECART, what are your HVAC requirements (fresh air, cooling tonnage, etc.)
Previous
Next
Submit
Press
Enter
29
Mechanical/Plumbing Preparation
Please Select
Provided by MECART
Provided by another supplier
None
To be determined
Please Select
Please Select
Provided by MECART
Provided by another supplier
None
To be determined
Does MECART need to supply plumbing equipment?
If provided by MECART, what are your plumbing requirements
Previous
Next
Submit
Press
Enter
30
Kitchenette / Washrooms / Sinks
Please Select
Yes
No
To be determined
Please Select
Please Select
Yes
No
To be determined
Kitchenette with sink
Please Select
Yes
No
To be determined
Please Select
Please Select
Yes
No
To be determined
Washrooms
Please describe any other plumbing requirements
Previous
Next
Submit
Press
Enter
31
Fire detection/suppression preparation
Please Select
Yes
No
To be determined
Please Select
Please Select
Yes
No
To be determined
Horn strobe preparation
Please Select
Yes
No
To be determined
Please Select
Please Select
Yes
No
To be determined
Detector preparation (smoke or heat)
Sprinkler preparation *Fire detection/suppression components to be installed by licensed contractor at site
Previous
Next
Submit
Press
Enter
32
Delivery and installation
Please Select
Yes
No
Unknown
Please Select
Please Select
Yes
No
Unknown
Is the module part of a construction project?
Please Select
Yes
No
Unknown
Please Select
Please Select
Yes
No
Unknown
Are receiving docks available for the delivery?
Please Select
Ground floor
Other
Please Select
Please Select
Ground floor
Other
On which floor level is the project?
If not on ground floor, what kind of elevator and/or lifting equipment are available. Please describe.
Previous
Next
Submit
Press
Enter
33
Miscellaneous
Please Select
Yes - MECART standard on rail
Yes - Other brand
No
To be determined
Please Select
Please Select
Yes - MECART standard on rail
Yes - Other brand
No
To be determined
Need operator chairs?
If yes, please state the specific brand you want
Please Select
Yes
No
To be determined
Please Select
Please Select
Yes
No
To be determined
Need furniture or control desk
If yes, please describe
Any other utilities or process/control equipment to integrate in the cabin? If any, please describe
Any other special required feature, please describe
Previous
Next
Submit
Press
Enter
34
What's your priority?
Please check all that apply
Price / Budget
Lead Time
Acoustics / Noise Isolation
Robustness / Product Lifespan
Modularity / Movability
Other
Previous
Next
Submit
Press
Enter
35
Please verify that you are human
*
This field is required.
Previous
Next
Submit
Press
Enter
Should be Empty:
Question Label
1
of
35
See All
Go Back
Submit