**Be aware that our geographic isolation makes acquisition of supplies both costly and time consuming. Many items considered standard elsewhere must be special ordered on Molokai and require time for shipping. Do not assume supplies can
be readily acquired on island. We need a minimum lead time of three weeks, preferably more, to order any materials. If a program must be cancelled due to lack of supplies resulting from the instructor’s failure to adequately plan for and inform the MAC of materials cost or procurement, the MAC will not be responsible for paying instructor fees or travel costs.