The inspector will generally try to call the contact when they head to the site. Regardless of whether a call is received, a representative needs to be onsite the day of the requested inspection (8AM-4PM). Requests for specific timeframe may be noted but may not be able to be accommodated in the inspection schedule.
A printed copy of the approved/stamped plans and the permit are required to be on-site during inspections. All testing equipment and labor shall be provided by the Contractor.
The Contractor’s failure to maintain approved drawings, documents, completion forms, NFPA certifications, green tags, installation stickers, and licensed technicians onsite shall result in immediate failure of the inspection and will require a new inspection request to be submitted once the failed items are remedied.